My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 195 Draft 02 1998-2000
ClerkCouncil
>
Council Records
>
Bills
>
1998-2000
>
BIL 195 Draft 02 1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2008 2:06:34 PM
Creation date
5/10/2008 5:16:51 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
1998-2000
Bill/Resolution
195
Draft
02
Introducer
Bobby Jean Leithead-Todd, Councilmember PC Chair
Referred To
PC
File Code
ZNG/PN
Document Relationships
COM 0027.001 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the Phase I area and shall be completed within two (2Zyears thereafter. <br /> Connector Road 2 may be constructed in stagest the first of which shall consist of <br /> a preliminary vehicular access (hereinafter defined as road improvements <br /> constructed to non-dedicable standards meeting with the safety and design <br /> requirements of the Department of Public Works). Construction of the first stage <br /> shall be completed prior to the issuance of the Count~%'s approval of occupancy <br /> for any portion of the Phase II Area. The second stage shall consist of up rg ading <br /> the preliminary vehicular access to dedicable standards, meeting with the approval <br /> of the Department of Public Works, and which shall be constructed concurrently <br /> with the development of the lands immediately fronting_the roadway. Connector <br /> Road 2 shall be consistent with the approved future roadway circulation plan and <br /> shall be dedicated to the County of Hawaii upon completion. In conntunction with <br /> final subdivision approval for any portion of the Project Area Phase 1 ,the <br /> applicant shall record a covenant, meeting with the approval of the Planning <br /> Director, with the Bureau of Conveyances requiring the construction of Connector <br /> Road 2 in the manner and schedule prescribed above. <br /> <br /> N. Should the County determine that construction of Connector Roads 1 and/or 2 is <br /> required prior to the schedule described above, the County may, at its own cost, <br /> improve the roadway(s). In this event, the applicant shall dedicate the road <br /> ri~ht(sLof--way at no cost to the County upon its request. <br /> [J]O. A drainage study, if required, shall be prepared and submitted for approval to the <br /> Department of Public Works prior to Final Subdivision Approval. Drainage <br /> system shall be constructed meeting with the approval of the Department of <br /> Public Works in conjunction with Final Subdivision Approval. <br /> -6- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.