Laserfiche WebLink
n~+"°~"~: Departrnent of Justice <br />r ~ <br />Office of Justice Programs AWARD CONTINUATION <br />v~ „- } ~ Bureau of Justice Assistance SHEET PACE a of m <br />'~ <br />~ Grant <br />°m,, <br />PROILCT NUMBER 2009-SB-B9-2403 AWARD DATE 0]/1]/2009 <br />SPECIAL CONDITIONS <br />27. RECOVERY ACT-Buy American Notification (Recovery Ac[, section 1605) <br />The recipient understands that [his award is subject [o the provisions of section 1605 of the Recovery Act ("Buy <br />American"). No award funds may be used for iron, steel, or manufactured goods for a project for the constmction, <br />alteration, maintenance, or repair of a public building or public work, unless the recipient provides advance written <br />notification m the O1P program office, and a Grant Adjustment Notice is issued that modifies this special condition to <br />add govemmen[-wide standard conditions (anticipated [o be published in subpart B of 2 C.F.A. part 176) that further <br />implement the specific requirements or exceptions of section 1605. <br />Section 1605 of the Recovery Act prohibits use of any Recovery Ac[ funds for a project for [he constmction, alteration, <br />maintenance, or repair of a public building or public work unless all of the iron, steel, and manufactured goods used in <br />the project are produced in the United States, subject to certain exceptions, including United States obligations under <br />in[ema[ional agreements. <br />For purposes of this special condition, the following definitions apply: <br />"Public building" and "public work" means a public building of, and a public work of, a govemmental entity (the United <br />Stales; [he District of Columbia; commonwealths, tenitories, and minor outlying islands of the United States; Slate and <br />local governments; and multistate, regional, or interstate entities which have govemmental functions). These <br />buildings and works may include, without limitation, bridges, dams, plants, highways, parkways, streets, subways, <br />tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, <br />wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, and canals, and [he constmctioq alteration, <br />maintenance, or repair of such buildings and works. <br />"Manufactured good" means a good brought [o the constmction site far incorporation into [he building or work that has <br />been-- <br />(I)Processed into a specific form and shape; or <br />(2) Combined with other raw material to create a material [hat has different properties than the properties of the <br />individual raw materials. <br />"Steel" means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other <br />elements. <br />For purposes of O1P grants, projects involving construction, alteration, maintenance, or repair ofjails, detention <br />facilities, prisons, public crime victims' shelters, police facilities, or other similar projecl5 will likely [rigger this <br />provision. <br />NOTE: The recipient is encouraged to contact the OIP progmm manager- in advance -with any questions concerning <br />this condition, including its applicability [o particular circumstances. <br />O/P FORM 4000/2 (REV. 4-88) <br />