My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0550.000 2008-2010
ClerkCouncil
>
Council Records
>
Communications
>
2008-2010
>
COM 0550.000 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2010 12:11:48 PM
Creation date
9/25/2009 11:59:58 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2008-2010
Communication
0550
Point
000
Author
Nancy Crawford, Finance Director
Communications - Referred To
FC
Document Relationships
AGE COUNCIL 10/07/2009 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Council
BIL 152 Draft 01 2008-2010
(Related)
Path:
\Council Records\Bills\2008-2010
BIL 152 Draft 01 2008-2010
(Related To)
Path:
\Council Records\Bills\2008-2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form #: B -52 <br />7/18/91 <br />DEPARTMENT OF FINANCE <br />REQUEST FOR COUNCIL ACTION <br />DEPARTMENT: Public Works DATE: 9/21/09 <br />STAFF CONTACT: Warren H. W. Lee PHONE: <br />961 -8324 <br />A. REQUEST: <br />An ordinance amending Ordinance 09 -65, The Capital Budget, by adding an appropriation for Hawaiian <br />Ocean View Estates (HOVE) Water Facilities Project in the amount of $400,000.00. <br />B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): <br />In FY 2006 the State of Hawaii appropriated $6 million to develop a potable water source for Hawaiian <br />Ocean View Estates (HOVE). The County of Hawaii Department of Water Supply (DWS) administered 2 <br />contracts utilizing these funds. The first was to drill and test an exploratory well, and the second was to <br />design and build the production facilities. The current design build contract for $3,395,813.00 includes a <br />100,000 gallon reinforced concrete reservoir and 1 standpipe. <br />An additional $400,000.00 is required to increase the reservoir size to 300,000 gallons and provide an <br />additional standpipe for water haulers. These revisions will enhance the current design to allow for future <br />expansion of the water system <br />We are requesting to waive hearing this Bill at the Finance Committee and proceed directly to Council, as <br />the project contract is ready to go. <br />SIGNED: w " �� DATE: <br />Department Head <br />
The URL can be used to link to this page
Your browser does not support the video tag.