Laserfiche WebLink
M <br />Memo to the Plxwn,uv, Diaector <br />March 29, 2010 <br />Pate 3 of 3 <br />On page 22, last paragraph, the TIAR indicates that there will be a LOS E during the a.m. <br />peak hour of traffic. The paragraph also state -.s that the intersection will be "fully" <br />channelized, however only a dedicated left turn lane is proposed. Similarly on page 24. <br />the third paragraph states a "fully" channelized intersection. <br />The conclusions on page 25 conflicts with the information provided in the body of the TIAR. <br />On Figure 14B in the north bound direction on Komohana Street between Kukuau Street <br />and Ponohawai Street there is a loss of 275 vehicles in the @.m� peak hour of traffic. <br />Similarly 295 vehicles are lost between Ponohawai Street and Puu Nonu Place in the north <br />bound direction. . . <br />The TIAR states that in 2030, the project will extend Ponohawai Street to intersect Mohouli <br />Street. Review of Figures 14 and 14B (2030) shows that the west bound through is <br />projected to be 50(85) vehicles during the a.m.(p.m.) peak hour of traffic. Figures 13 and <br />13B (2020) shows the same movement as 35(80) vehicles during the a.m.(p-m.) peak hour. <br />With the extension of Ponohawai Street to Mohouli Street, would there be a possibility of <br />traffic being redirected from Mohouli Street to Ponohawai Street? <br />The tables at the end of the TIAR indicate some movements will be operating at LOS E <br />even with mitigation measures. <br />We recommend a condition for the provision a revised TIAR be submitted similar to <br />condition X of Ordinance No. 04-144 of the former University Terrace Project District. <br />Questions may be referred to Kelly Gomes of our Engineering Division at ext. 8327. <br />KG <br />A o.;nq pt I ia.zii is an ijy i Op, apmut} E ro jdir un,f I jnpPo;a <br />