My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0876.002 2008-2010
ClerkCouncil
>
Council Records
>
Communications
>
2008-2010
>
COM 0876.002 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2010 2:58:26 PM
Creation date
7/23/2010 9:31:10 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2008-2010
Communication
0876
Point
002
Author
Emily I. Naeole-Beason, Council Vice Chair
Communications - Referred To
PWIRC
Comments
Council: Close file - 09/09/10
Document Relationships
AGE COUNCIL 09/09/2010 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Council
AGE PWIRC 08/03/2010 2008-2010
(Related)
Path:
\Council Records\Agendas\2008-2010\Public Works & Intergovernmental Relations Committee (PWIRC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exeeption-; The eade offieial is authorized to waive the <br />ients for ._,.t.uetion docum othe supp oi4ing d if the <br />effieial deter-mines they are t n fin:., eom plianee <br />with this eerie. <br />" 103.1 General Plans specifications and necessary computations shall be <br />submitted to indicate compliance with this code. Plans specifications, and <br />necessary computations for work to comply with this code shall be <br />prepared designed, approved certified and stamped by a duly registered <br />licensed professional as required by Chapter 464 of the Hawaii Revised <br />Statutes for the following work <br />1. All electrical power, equipment and lighting requirements shall be <br />completed and certified by an electrical engineer. <br />2. All requirements of heating, ventilating air conditioning systems <br />and equipment service water heating systems and equipment shall <br />be completed and certified by a mechanical engineer. <br />3. All elements of building envelope and building_ performance <br />requirements shall be completed and certified by an architect or <br />mechanical engineer. <br />EXCEPTION• A duly registered professional architect may <br />prepare design approve certify and stamp the following plans, <br />specifications and necessary computations when any of the <br />following conditions are complied with: <br />1. Lighting and /or electrical plans when the total load of all <br />electrical work shall not exceed 35 kilo -volt amperes. <br />2. Mechanical plans when the building or structure is heated, <br />ventilated or equipped and cooled with an air conditioning <br />system with a total capacity of not more than 60,000 <br />BTU /Hr. <br />Specifications and necessary computations need not be <br />submitted when authorized by the code official. <br />(5) Amending Section 103.3.1. Section 103.3.1 is amended to read as follows: <br />"103.3.1 Approval of construction documents. When the code official <br />issues a permit [whef( eenstruetien doeume are required, the <br />eenst-r-ttetio doeuments shall - beenaorsed -ice; -anal <br />"Re viewed fef"Eede- Complianee" the code official shall affix an <br />official stamp of approval to the specifications and each sheet of the job <br />
The URL can be used to link to this page
Your browser does not support the video tag.