Laserfiche WebLink
any and every owner, contractor or other person engaged in construction of the <br /> building or structure, or otherwise, covering or allowing to be covered such <br /> portion of work or equipment, or removing any notice not to cover same placed <br /> thereon by the [administrative authority] authority having jurisdiction shall <br /> likewise be liable to the penalties provided for in this chapter. <br /> SECTION 9. Chapter 9, article 2, section 9 -12 of the Hawai`i County Code 1983 (2005 <br /> Edition, as amended) is amended to read as follows: <br /> Section 9 -12. Final inspection required. <br /> (a) • : . . - - - • . - - :y to any cicctrical installation on <br /> which cicctrical work was or is being performcd under a permit issued pursuant to <br /> - .. • - .. - - he administrative authority has approved <br /> such installation, and all code and permit requirements of the Hawai`i County • <br /> . - . , - - • • . • , <br /> (chapter 11), Plumbing (chapter 17), and Outdoor Lighting (chapter 14, article 9) <br /> applicable to the use and /or structure have been satisfied. <br /> EXCEPTION: <br /> Power to test an electrical installation may be granted by the administrative authority for <br /> (1) The service main disconnect mu .... - - ... - - .. - <br /> pesitieni <br /> (2) There must be a need to test the installation; and <br /> (3) The cicctrical contractor must remain in direct control of the installation while it <br /> is energized. <br /> Permission may be granted for testing to proceed for ten day periods, not to exceed thirty <br /> expired, the contractor shall notify the administrative authority to lock the main <br /> service disconnect in the open position. <br /> A final inspection is required after all work required by the electrical permit is completed <br /> and complies with all the requirements of this chapter. <br /> (b) [Whenever electric wiring has been approved, a ] A certificate of inspection <br /> [therefor shall] may be issued [owe] upon request by the electrical <br /> contractor on record, provided all fees required by this chapter have been [paid.] <br /> satisfied. <br /> (c) The supervising electrician shall be present on the job site upon the request of the <br /> [administrative authority.] authority having jurisdiction. <br /> (d) Any installation in violation of this section shall be subject to discontinuance of <br /> electrical service by the administrative authority.] <br /> 6 <br />