Laserfiche WebLink
(C) The proposed assessment unit and method of assessment; <br /> (D) Whether any new land will be necessary to be acquired, and the <br /> estimated cost thereof and the proportion of the cost which should <br /> be borne by the County; <br /> (E) The materials recommended to meet the conditions of the <br /> improvement; <br /> (F) The boundaries of the proposed improvement district and any <br /> subdistricts or zones therein as to which different portions of the <br /> cost shall be charged; and <br /> (G) The estimated cost of the improvement, the portions of the cost to <br /> be borne by the County, and the portions of the cost to be <br /> specifically assessed against the assessment units specially <br /> benefited with the maximum unit of assessment to be made; and <br /> (2) To prepare and furnish all necessary drawings and other data, details, and <br /> specifications for the improvements and any other matters or details <br /> intended to apply thereto. The report when so furnished and filed with the <br /> council shall not be acted upon until one week has elapsed from the date <br /> of the filing of the same. <br /> (e) If the proposed improvement district includes the construction [or improvement of <br /> appliance for supplying or distributing a water supply] and installation of <br /> improvements to be undertaken or supervised by a cooperating department, the <br /> responsible director [of public works] or manager shall obtain from the <br /> cooperating department [of water supply] preliminary plans and estimates for <br /> such cooperating department's proposed [water-system] improvements, and the <br /> responsible director [of public works] or manager shall furnish the cooperating <br /> department [of water supply] with such preliminary plans of the proposed <br /> [improvement] improvements, other than those of the cooperating department, as <br /> will enable the cooperating department [ofwater supp'.,] to make its plans and <br /> estimates [or the proposed water system]. The responsible director [of public <br /> works] or manager shall incorporate such preliminary plans and estimates of the <br /> cooperating department [of-water-supply] in the report to the council. <br /> (f) The council may, by resolution requiring one reading for its adoption, propose the <br /> making of an improvement or improvements specifying: <br /> (1) The streets, storm drainage, sanitary sewerage system, water system or <br /> street lighting system, or combination thereof, to be opened, constructed, <br /> or improved; <br /> (2) The area, owners, so far as known, and general description and location of <br /> new land to be acquired, if any; <br /> (3) The materials proposed to be used; <br /> (4) The proposed unit of assessment and method of assessment including the <br /> minimum number of installment payments to be proposed; <br /> (5) The maximum term of assessment bonds to be issued to represent unpaid <br /> installments; <br /> (6) The maximum rate of interest to be borne by the bond; <br /> 8 <br />