My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 236 Draft 02 1996-1998
ClerkCouncil
>
Council Records
>
Bills
>
1996-1998
>
BIL 236 Draft 02 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2021 10:38:29 AM
Creation date
6/24/2011 2:35:53 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
1996-1998
Bill/Resolution
237
Draft
02
Introducer
Bobby Jean Leithead-Todd, Council Member
Referred To
PC
Action 1
Presented: PC - 5/15/98
Action 2
PC-113: Recommends passage of Bill 236, Draft 2, on first reading - 05/15/98
Action 3
Council: Passes Bill 236, Draft 2 on first reading and adotps PC-113 - 06/01/98
Action 4
Council: Adopts Bill 236, Draft 2 on second and final reading - 06/16/98
Status
Adopted
Date To Mayor or Adoption Date
6/19/1998
Reading Number
1
Reading Date
6/1/1998
Ayes
8-Arakaki, Chung, Leithead-Todd, Reynolds, Santangelo, Smith, Tyler, Yagong
Noes
0
Absent
1-Ray
Excused
0
Reading Number .
2
Reading Date .
6/16/1998
Ayes .
9-Arakaki; Chung; Leithead-Todd; Ray; Reynolds; Santangelo; Smith; Tyler; Yagong
Noes .
0
Absent .
0
Excused .
0
Document Relationships
COM 0827.001 1996-1998
(Related To)
Path:
\Council Records\Communications\1996-1998
ORD 1998-066 1996-1998
(Related To)
Path:
\Council Records\Ordinances\1998
REP PC 113 05/15/1998 1996-1998
(Related)
Path:
\Council Records\Reports\1996-1998\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
performed by the County has been reimbursed; <br />fn)[(0)] comply with all other applicable laws, rules, regulations and requirements, <br />including those of the State Land Use Commission; <br />(W[(P)] should the Council adopt a Unified Impact Fees Ordinance setting forth criteria <br />for the imposition of exactions or the assessment of impact fees, conditions <br />included herein may, at the developers' election, be satisfied by the performance <br />in accordance with the requirements of the Unified Impact Fees Ordinance; <br />Rj[(Q)] an annual progress report shall be submitted to the Planning Director prior to <br />the anniversary date of the effective date of the change of zone. The report shall <br />address the status of the development and the compliance with the conditions of <br />approval. This condition shall remain in effect until all of the conditions of <br />approval have been complied and the Planning Director acknowledges that <br />further reports are not required; <br />LW[(R)] an extension of time for the performance of conditions within the ordinance may <br />be granted by the Planning Director upon the following circumstances: <br />1) the non-performance is the result of conditions that could = have been <br />foreseen or are beyond the control of the applicants, successors or <br />assigns, and that are not the result of their fault or negligence; <br />2) granting of the time extension would not be contrary to the General Plan <br />or Zoning Code; <br />3) granting of the time extension would not be contrary to the original <br />reasons for the granting of the [permit]chanee off; <br />4) the time extension granted shall be for a period not to exceed the period <br />originally granted for performance (i.e., a condition to be performed <br />within one year may be extended for up to one additional year); and <br />5) if the applicants should require an additional extension of time, the <br />Planning Director shall submit the applicants' request to the County <br />Council for appropriate action. <br />(M Further, should any of the conditions not be met or substantially complied with <br />VI <br />
The URL can be used to link to this page
Your browser does not support the video tag.