Laserfiche WebLink
(B) Obtain approvals from other approving department /agencies. <br /> (6) Approval from DPW - Building Division will be given within forty-eight hours. <br /> (7) Pre - approved construction drawings will not be required to be individually stamped by a duly <br /> registered engineer or architect in accordance with chapter 464, Hawai`i Revised Statutes. <br /> Section 5 -27. Requirements for plans and specifications. <br /> (a) Plans and specifications shall be drawn to scale upon substantial paper and shall be of sufficient <br /> clarity to indicate the nature and extent of the work proposed and show in detail that it will conform <br /> to the provisions of this code and all relevant laws, ordinances, rules and regulations. The first <br /> sheet of each set of plans shall give the tax map key number of the work site and the name and <br /> address of the owner and person who prepared the plans, along with occupancy and type of <br /> construction, and floor area computations. Plans shall include a plot plan showing the location of <br /> the proposed building and every existing building on the property. The following information shall <br /> be included in the code search information which will be part of the plans submitted, that is the <br /> basis of the building design which includes but is not limited to the following: Type of <br /> Construction; Occupancy; Basic Allowable Floor Areas; Separation for Mixed Occupancy; etc. In <br /> lieu of detailed specifications, the building official may approve references on the plans to a <br /> specific section or part of this code or other ordinances or laws. <br /> (b) Computations, stress diagrams, and other data sufficient to show the correctness of the plans, shall <br /> be submitted when required by the building official. <br /> (c) All plans other than R -3 and U occupancies shall have on the plans information of occupancy, type <br /> of construction, floor area computations, allowable area increases, separation wall if used, fire <br /> resistive substitution, fire sprinkler, exits, etc. Information shall show code search information for <br /> building design. <br /> Section 5 -28. Issuance of permits <br /> (a) The application, plans and specifications filed by an applicant for a permit shall be reviewed by the <br /> building official. Plans shall be reviewed by any other appropriate department of the County and <br /> the State to verify compliance with laws and ordinances under their jurisdiction. If the building <br /> official finds that the work described in an application for a permit and the plans, specifications and <br /> other data filed therewith conform to the requirements of this code and other pertinent laws and <br /> ordinances, and the fees have been paid, the building official shall issue a permit therefore to the <br /> applicant; provided that no permit shall be issued for the moving of any building or structure or <br /> portion thereof which has deteriorated or has been damaged to an extent greater than fifty percent <br /> of the cost of replacement (new) of such building or structure. <br /> Exception. The Building Division will waive the requirements of plan and specification <br /> review by the building official of pre- approved R -3 Occupancy package model homes previously <br /> approved by the department of public works. <br /> (b) When the building official issues the permit, the building official shall endorse in writing or stamp <br /> on all sets of plans and specifications "REVIEWED." Such reviewed plans and specifications shall <br /> not be changed, modified, or altered without authorization from the building official, and all work <br /> shall be done in accordance with the approved plans. <br /> (c) The building official may issue a permit for the construction of part of the building or structure <br /> before the entire plans and specifications for the whole building or structure have been submitted or <br /> approved, provided adequate information and detailed statements have been filed complying with <br /> all pertinent requirements of this code. The holder of such permit shall proceed at the holder's own <br /> risk without assurance that the permit for the entire building or structure will be granted. <br /> 10 <br />