My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 270 Draft 03 2008-2010
ClerkCouncil
>
Council Records
>
Bills
>
2008-2010
>
BIL 270 Draft 03 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2012 9:29:24 AM
Creation date
7/12/2011 10:00:18 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2008-2010
Bill/Resolution
270
Draft
03
Introducer
Dominic Yagong, Council Member
Referred To
COUNCIL
Action 1
Council: Bill 270, Draft 3 passes first reading; adopts PWPRC-22 - 07/07/11
Action 2
Council: Bill 270, Draft 3 passes second & final reading - 07/22/11
Action 3
Council: Postpones reconsideration of Bill 270, Draft 3 to 09/21/11 - 08/17/11
Action 4
Council: Bill 270, Draft 3 postponed to 10/05/11 Council Meeting - 09/21/11
Action 5
Council: Bill 270, Draft 3 held over to the 10/19/11 Council Meeting - 10/05/11 See sticky note for more actions.
Date To Mayor or Adoption Date
8/2/2011
Reading Number
1
Reading Date
7/7/2011
Ayes
8-Blas;Ford;Hoffmann;Ikeda;Onishi;Smart;Yagong;Yoshimoto
Noes
0
Absent
1-Pilago
Excused
0
Reading Number .
2
Reading Date .
7/22/2011
Ayes .
5-Blas;Ford;Hoffmann;Pilago;Smart
Noes .
4-Ikeda;Onishi;Yagong;Yoshimoto
Absent .
0
Excused .
0
Reading Number ..
3
Reading Date ..
11/2/2011
Document Relationships
AGE COUNCIL 07/22/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE COUNCIL 09/21/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE COUNCIL 10/05/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE COUNCIL 10/19/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE COUNCIL 11/02/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
COM 0128.002 2010-2012
(Related To)
Path:
\Council Records\Communications\2010-2012
COM 0128.002 2010-2012
(Related)
Path:
\Council Records\Communications\2010-2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(d) The building permit shall be posted in a conspicuous place on the site during the progress of work. <br /> (e) No permit issued shall authorize any person or contractor to do work upon any phase of the <br /> building, structure or project unless specifically identified in the permit application, including any <br /> attachment or amendments thereto, as the contractor or subcontractor designated to do that <br /> particular phase of work. <br /> (f) If there is a change in the designation of any contractor for any phase of work subsequent to the <br /> issuance of a permit, the permittee shall submit the change in writing to the building official <br /> requesting approval of the change, and include a non - refundable payment of $25 for the transferring <br /> of the building permit. <br /> Section 5 -29. Reserved. <br /> Section 5 -30. Reserved. <br /> Division 4. Fees. <br /> Section 5 -31. Permit fees. <br /> A permit shall not be valid until the fees prescribed by law have been paid, nor shall an amendment <br /> to a permit be released until the addition fee, if any, has been paid. <br /> (1) The fee for each permit shall be as set forth in section 5 -36, Table 1A — BUILDING PERMIT <br /> FEES. <br /> (2) The determination of value or valuation under any of the provisions of this code shall be <br /> made by the building official. The valuation to be used in computing the permit fees shall be <br /> the total value of all construction work for which the permit is issued, as well as all finish <br /> work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire - <br /> extinguishing systems and any other permanent work or permanent equipment. <br /> (3) When work for which a permit is required by this code has commenced without obtaining <br /> said building permit, the fees specified shall be doubled, but the payment of such double fee <br /> shall not relieve any person from fully complying with the requirements of this code in the <br /> execution of the work nor from any other penalties prescribed in this code. <br /> Section 5 -32. Refunds. <br /> Refunds for permits shall be made in accordance with section 2 -12 of the Hawai`i County Code. <br /> Section 5 -33. Compliance with Hawaii Revised Statutes. <br /> Identity of Licenses. It shall be unlawful for any permittee to perform or allow to be performed, <br /> any work covered by the permit issued in violation of chapter 444, Hawai`i Revised Statutes, relating to <br /> the licensing of contractors. <br /> Section 5 -34. Exemption. <br /> (a) The County, all agencies of the County, and contractors with the County, shall be exempted from <br /> the requirement of paying any permit fees. <br /> (b) Habitat for Humanity Hilo and Habitat for Humanity Kona shall be exempt from the requirement of <br /> paying any permit fee. This exemption shall not apply to penalty fees when required under this <br /> chapter. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.