My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0279.000 2010-2012
ClerkCouncil
>
Council Records
>
Communications
>
2010-2012
>
COM 0279.000 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2012 10:57:06 AM
Creation date
7/22/2011 9:03:33 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2010-2012
Communication
0279
Point
000
Author
Colleen Schrandt, Leg. Auditor
Communications - Referred To
PWPRC
Comments
GRC: Close file 8/2/2011
Document Relationships
AGE PWPRC 08/02/2011 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Public Works & Parks & Recreation Committee (PWPRC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Strategic Plan Outdated and Has Not Been Fully Implemented <br /> Recommendation 2.2: P&R should complete updating its 2004-2009 Strategic Plan. An <br /> ongoing process for updating its strategic plan, and reviewing and reporting progress toward <br /> achieving strategic goals should also be developed. <br /> No Written Hazardous Materials Mediation Plan <br /> Recommendation 2.3: P&R should develop a plan to remediate hazardous materials issues at <br /> its facilities, and integrate it into an overall asset management plan with a process to track and <br /> report on performance. The hazardous materials remediation plan should include any safety <br /> measures implemented at each facility as well as cost estimates to remediate each identified <br /> hazardous condition. <br /> ADA Access Plan Not Integrated into Asset Management Plan <br /> Recommendation 2.4: P&R should integrate its ADA Access Plan into an overall asset <br /> management plan with a process to track and report on performance. <br /> Insufficient Periodic Maintenance Plan <br /> Recommendation 2.5: The Parks Maintenance Division should develop a comprehensive <br /> periodic maintenance plan that includes schedules for critical maintenance of facility <br /> components, such as roof painting and termite treatment. <br /> Lack of Plan to Reduce Maintenance and Repair Backlog <br /> Recommendation 2.6: P&R should develop a plan to reduce its backlog of deferred <br /> maintenance and repairs based on a current facilities condition assessment, and integrate it into <br /> an overall asset management plan with a process to track and report on performance. <br /> Insufficient Prioritization of Projects <br /> Recommendation 2.7: P&R should develop a method for prioritizing its facilities maintenance <br /> projects that is based on asset management best practices. This would include placing a high <br /> priority on preventative maintenance and timely completion of minor repairs before major repairs <br /> are required. <br /> FINDING THREE: P&R's BUDGETING PROCESS FOR FACILITIES MAINTENANCE AND <br /> REPAIRS IS INSUFFICIENT <br /> Budget Process Does Not Incorporate Facilities Data <br /> Recommendation 3.1: P&R needs to develop and implement a budget process that <br /> incorporates facilities condition information reported by its Parks Maintenance and Recreation <br /> Divisions in order to sufficiently plan, prioritize, and budget for its critical repair needs and <br /> corrective measures. Once budgeted, Operating funds should be expended for planned and <br /> prioritized periodic maintenance and repair activities to prevent the deterioration of facilities and <br /> the need for major repairs requiring CIP funds. <br /> Budget Process is Insufficient and Lacks Transparency <br /> Recommendation 3.2: P&R needs to develop and implement a budget process that <br /> incorporates assessing the condition of all of its facilities; prioritizing its maintenance and repair <br /> needs; planning its maintenance and repair activities and schedules; and tracking its activities, <br /> performance, and outcomes in order to adequately budget for its maintenance and repair <br /> operations and projects. <br /> 3 <br />