My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0279.000 2010-2012
ClerkCouncil
>
Council Records
>
Communications
>
2010-2012
>
COM 0279.000 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2012 10:57:06 AM
Creation date
7/22/2011 9:03:33 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2010-2012
Communication
0279
Point
000
Author
Colleen Schrandt, Leg. Auditor
Communications - Referred To
PWPRC
Comments
GRC: Close file 8/2/2011
Document Relationships
AGE PWPRC 08/02/2011 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Public Works & Parks & Recreation Committee (PWPRC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P&R Does Not Have Reliable Estimates of Building Replacement Values <br /> Recommendation 3.3: P&R should calculate the current costs to replace each building and <br /> record this data in its facilities inventory. <br /> P&R Does Not Have Accurate Cost Estimates for Deferred Maintenance Backlog <br /> Recommendation 3.4: P&R should calculate current cost estimates to return each facility to a <br /> "safe, clean, enjoyable, accessible and aesthetically pleasing" condition that is one of its <br /> strategic goals for facilities. A condition assessment and cost analysis for repairs, hazardous <br /> materials abatement, and ADA improvements should be completed for each facility in order to <br /> evaluate whether it would be more cost-effective to rehabilitate or replace the facility. <br /> FINDING FOUR: P&R OPERATIONAL PROCESSES FOR FACILITIES MAINTENANCE <br /> AND REPAIRS ARE INSUFFICIENT <br /> Inventory of Facilities is Missing Key Components <br /> Recommendation 4.1: P&R should develop a complete facilities inventory that includes the <br /> essential inventory information recommended by the Government Finance Officers Association <br /> (GFOA) and National Research Council (NRC), and sufficient detail to assess current condition <br /> of facilities and their major components. <br /> Insufficient Periodic Maintenance and Repair Operations <br /> Recommendation 4.2: The Parks Maintenance Division should develop a list and schedule of <br /> critical maintenance and repair activities. All maintenance and repair activities should be <br /> tracked to completion in the Maintenance Work Request System maintained by the Division. <br /> The County Administration should also evaluate the possibility of supplementing Parks <br /> Maintenance Division manpower and equipment with any capacity from other departments, and <br /> clarify any resource-sharing responsibilities of the departments in written policies and <br /> procedures. <br /> Insufficient Recognition of the Impact of Deferring Maintenance and Repair <br /> is a Root Cause of Deteriorating Facilities <br /> Recommendation 4.3: The County Administration and Council could facilitate the success of <br /> P&R's asset management efforts by setting a "Tone at the Top"establishing the highest priority <br /> for performance of and accountability for maintenance of existing recreational assets and <br /> infrastructure by: <br /> • Establishing and communicating the priority for maintaining existing assets and infrastructure. <br /> • Requiring the development of CIP and Operating Budgets funded with County-generated <br /> revenues to be based on long-term plans that recognize the priority for routine and <br /> preventative maintenance and major rehabilitation or replacement. <br /> • Requiring that all proposed CIP project data sheets (Financial Impact Statements) include the <br /> analysis and disclosure of: <br /> o Ongoing maintenance costs, including full-time employee (FTE) requirements. <br /> o Life cycle cost estimates and plans to reduce life cycle costs through the use of alternative <br /> materials and construction methods. <br /> • Requiring the establishment of and reporting on relevant and quantifiable performance <br /> measures for long-term asset and infrastructure maintenance. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.