My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 270 Draft 05 2008-2010
ClerkCouncil
>
Council Records
>
Bills
>
2008-2010
>
BIL 270 Draft 05 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2012 10:07:45 AM
Creation date
12/9/2011 1:31:46 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2010-2012
Bill/Resolution
270
Draft
05
Introducer
Brittany Smart, Council Member
Referred To
PWPRC
Action 1
PWPRC: Postponed to December 20, 2011 - 12/06/2011.
Action 2
PWPRC: Postponed to January 3, 2012 - 12/20/2011.
Action 3
PWPRC: Amends Bill 270, Draft 5, to Draft 6 - 01/03/2012.
Document Relationships
AGE PWPRC 01/03/2012 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Public Works & Parks & Recreation Committee (PWPRC)
AGE PWPRC 12/20/2011 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Public Works & Parks & Recreation Committee (PWPRC)
COM 0128.113 2010-2012
(Related)
Path:
\Council Records\Communications\2010-2012
REP PWPRC 067 01/03/2012 2010-2012
(Related)
Path:
\Council Records\Reports\2010-2012\Public Works & Parks & Recreation Committee (PWPRC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(4) There shall be a one time plan review fee based on the actual valuation of the dwelling to be <br /> paid by the package model home manufacturer who is submitting the plans for pre-approval. <br /> Fees will be charged per model submitted, per section 5-36, table 1-A, item E. All other <br /> occupancies shall be based on valuation and the schedule below. <br /> (5) When submitting for building permit under pre-approved plans,the owner/contractor shall: <br /> (A) Submit two (2) sets of complete working drawings showing the pre-approved <br /> model number along with the manufacturer's wet seal and authorizing signature. <br /> DPW-Building Division will verify seal and signature. <br /> (B) Obtain approvals from other approving department/agencies. <br /> (6) Approval from DPW-Building Division will be given within forty-eight hours. <br /> (7) Pre-approved construction drawings will not be required to be individually stamped by a duly <br /> registered engineer or architect in accordance with chapter 464, Hawai`i Revised Statutes. <br /> Section 5-27. Requirements for plans and specifications. <br /> (a) Plans and specifications shall be drawn to scale upon substantial paper and shall be of sufficient <br /> clarity to indicate the nature and extent of the work proposed and show in detail that it will conform <br /> to the provisions of this code and all relevant laws, ordinances, rules and regulations. The first <br /> sheet of each set of plans shall give the tax map key number of the work site and the name and <br /> address of the owner and person who prepared the plans, along with occupancy and type of <br /> construction, and floor area computations. Plans shall include a plot plan showing the location of <br /> the proposed building and every existing building on the property. The following information shall <br /> be included in the code search information which will be part of the plans submitted, that is the <br /> basis of the building design which includes but is not limited to the following: Type of <br /> Construction; Occupancy; Basic Allowable Floor Areas; Separation for Mixed Occupancy; etc. In <br /> lieu of detailed specifications, the building official may approve references on the plans to a <br /> specific section or part of this code or other ordinances or laws. <br /> (b) Computations, stress diagrams, and other data sufficient to show the correctness of the plans, shall <br /> be submitted when required by the building official. <br /> (c) All plans other than R-3 and U occupancies shall have on the plans information of occupancy, type <br /> of construction, floor area computations, allowable area increases, separation wall if used, fire <br /> resistive substitution, fire sprinkler, exits, etc. Information shall show code search information for <br /> building design. <br /> Section 5-28. Issuance of permits <br /> (a) The application, plans and specifications filed by an applicant for a permit shall be reviewed by the <br /> building official. Plans shall be reviewed by any other appropriate department of the County and <br /> the State to verify compliance with laws and ordinances under their jurisdiction. If the building <br /> official finds that the work described in an application for a permit and the plans, specifications and <br /> other data filed therewith conform to the requirements of this code and other pertinent laws and <br /> ordinances, and the fees have been paid, the building official shall issue a permit therefore to the <br /> applicant; provided that no permit shall be issued for the moving of any building or structure or <br /> portion thereof which has deteriorated or has been damaged to an extent greater than fifty percent <br /> of the cost of replacement(new) of such building or structure. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.