My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0541.000 2010-2012
ClerkCouncil
>
Council Records
>
Communications
>
2010-2012
>
COM 0541.000 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 2:02:39 PM
Creation date
1/17/2012 1:54:33 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2010-2012
Communication
0541
Point
000
Author
Nancy E. Crawford, Director of Finance
Communications - Referred To
FC
Document Relationships
AGE COUNCIL 02/15/2012 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE COUNCIL 03/09/2012 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE FC 01/31/2012 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Finance Committee (FC)
BIL 176 Draft 01 2010-2012
(Related To)
Path:
\Council Records\Bills\2010-2012
REP FC 197 01/31/2012 2010-2012
(Related)
Path:
\Council Records\Reports\2010-2012\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form #: B -52 <br />7/18/91 <br />DEPARTMENT OF FINANCE <br />REQUEST FOR COUNCIL ACTION <br />DEPARTMENT: Public Works DATE: December 27, 2011 <br />STAFF CONTACT: Robert Yanabu PHONE: 961 -8586 <br />A. REQUEST: <br />Amend Ordinance 11 -60, the Capital Budget by adding the following appropriations: <br />Reed's Island Bridge Structural Rehabilitation - Federal $ 5,046,000.00 <br />Reed's Island Bridge Structural Rehabilitation - County $ 1,262,000.00 <br />B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): <br />The rehabilitation project is designed for and will be constructed to strengthen the bridge to meet current truck and lateral <br />seismic design loads, as prescribed by the Federal Highway Administration (FHWA). The existing wooden bridge deck will <br />be replaced by a combination of wide - flanged steel beams and structural grating deck. Concrete rock anchors and <br />micropiles will be installed beneath the existing bridge foundation and abutments to strengthen and increase its vertical and <br />horizontal load resistance capacity. Lateral structural steel bracing members will be installed, in both the longitudinal and <br />transverse directions, enabling the bridge to resist earthquake design forces. Special steel coatings, in addition to hot -dip <br />galvanizing, will be applied to the structural steel members to protect and extend its service life. <br />SIGNED: <br />Department Head <br />DATE: 12 -27 -11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.