Laserfiche WebLink
DEPARTMENT OF ENVIRONMENTAL MANAGEMENT <br />LETTER REPORT: PILOT STUDY ON LONG- HAULING TO WEST HAWAII SANITARY LANDFILL <br />July 25, 2012 <br />Since 1992, various studies have recommended more than one alternative for the disposal of solid <br />waste in Hawai'i County. Among the recommendations in the 2002 Updated Integrated Resources and <br />Solid Waste Management Plan (IRSWMP), two of the recommendations stated "construct no new <br />landfills in East Hawaii ", and "procure a waste reduction facility for the East Hawaii waste stream using <br />either mass -burn waste -to- energy, thermal gasification, or anaerobic digestion technology ". <br />Subsequent to adoption of the 2002 Updated IRSWMP, the County issued two (2) requests for proposals <br />(RFP) for construction of a waste reduction facility. The first RFP issued in 2004 was cancelled by the <br />County prior to award. The second RFP was issued in 2006 and later awarded to Wheelabrator <br />Technologies for the construction of a mass -burn waste -to- energy facility at the County -owned South <br />Hilo Sanitary Landfill (SHSL). In 2008, due to higher than anticipated construction and operation costs, <br />the County Council rejected the second RFP. <br />The 2009 Updated IRSWMP made residual management strategy recommendations including evaluating <br />the feasibility and cost - effectiveness of developing a new lined landfill adjacent to the SHSL site and <br />long- hauling solid waste to the West Hawaii Sanitary Landfill (WHSL) site taking into account hauling <br />operations, haul routes, traffic issues and equipment acquisition plans. <br />In 2011, the Department of Environmental Management executed a contract with R.W. Beck to perform <br />this evaluation and provide a report. The Hilo Landfill Feasibility Study (HLFS) report was finalized in <br />March 28, 2012 which evaluated the technical, economic, environmental, socioeconomic and <br />regulatory /permitting feasibility of landfilling adjacent to the SHSL. R.W. Beck updated and refined the <br />planning level cost estimates presented in the 2009 Updated IRSWMP for landfilling and long- hauling <br />from SHSL to WHSL. As summarized in R.W. Beck's report, the resulting net cost for landfilling ranged <br />from $70 /ton to $130 /ton (excluded were financing costs) depending upon the method of leachate <br />treatment. The resulting net cost for long- hauling ranged from $53 /ton to $57 /ton depending on <br />variations in individual cost components of loading and hauling. This also included the estimated <br />savings derived from a lower disposal rate for landfilling the east side tonnage at WHSL. If the cost <br />savings for landfilling at WHSL are excluded, the net cost for long- hauling would range from $67 /ton to <br />$ 71 /to n. <br />R.W. Beck's opinion was that while technically feasible, permitting and land use constraints, and <br />leachate management issues made design and permitting of a landfill expansion impractical and <br />uneconomical. Moreover, based on the updated and refined planning level cost estimates, long- hauling <br />from SHSL to WHSL was a potentially feasible and more cost - effective disposal alternative. The report's <br />final recommendation was to update the February 2004 traffic impact assessment prepared for the Final <br />Environmental Impact Statement for the East Hawaii Regional Sort Station. <br />1 <br />