My WebLink
|
Help
|
About
|
Sign Out
Home
RES 034 Draft 01 2012-2014
ClerkCouncil
>
Council Records
>
Resolutions
>
2012-2014
>
RES 034 Draft 01 2012-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2013 1:41:06 PM
Creation date
12/26/2012 9:07:15 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2012-2014
Bill/Resolution
034
Draft
01
Introducer
Valerie T. Poindexter, Council Member
Referred To
FC
Action 1
FC-21: Recommends adoption of Res. 34-13 - 1/8/13
Action 2
Council: Adopts Res. 34-13 & FC-21 - 01/23/13
Status
Adopted
Date To Mayor or Adoption Date
1/23/2013
Reading Number
1
Reading Date
1/23/2013
Ayes
8-Eoff;Ford;Ilagan;Kanuha;Kern;Onishi;Wille;Yoshimoto
Noes
0
Absent
1-Poindexter
Excused
0
Document Relationships
AGE COUNCIL 2013/01/23 2012-2014
(Message)
Path:
\Council Records\Agendas\2012-2014\Council
AGE FC 2013/01/08 2012-2014
(Related To)
Path:
\Council Records\Agendas\2012-2014\Finance Committee (FC)
COM 0057.000 2012-2014
(Related To)
Path:
\Council Records\Communications\2012-2014
REP FC 021 01/08/2013 (2012-2014)
(Related To)
Path:
\Council Records\Reports\2012-2014\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form RD 3570-3 <br /> Page 2 <br /> Grantee agrees that Grantee will: <br /> A.Cause said Project to be constructed within the total sums available to it,including Grant Funds, in <br /> accordance with any architectural or engineering reports,and any necessary modifications,prepared <br /> by Grantee and approved by Grantor, <br /> B. Provide periodic reports as required by Grantor and permit periodic inspection of the Project by a <br /> representative of the Grantor. For grant-only Projects,Form SF 269,"Financial Status Report,"and a <br /> project performance report will be required on a quarterly basis(due 15 working days after each of <br /> each calendar quarter).A final project performance report will be required with the last"Financial Status <br /> Report."The final report may serve as the last quarterly report.Grantees shall constantly monitor <br /> performance to ensure that time schedules are being met, projected work by time periods is being <br /> accomplished,and other performance objectives are being achieved.The project performance reports <br /> shall include,but not limited to,the following: <br /> 1.A comparison of actual accomplishments to the objectives established for that period; <br /> 2.Reasons why established objectives were not met; <br /> 3.Problems,delays,or adverse conditions which will affect attainment of overall project objectives, <br /> prevent meeting time schedules or objectives,or preclude the attainment of particular project work <br /> elements during established time periods.This disclosure shall be accomplished by a statement of <br /> the action taken or planned to resolve the situation;and <br /> 4.Objectives and timetables established for the next reporting period. <br /> C. Manage,operate,and maintain the facility,including this Project if less than the whole of said facility, <br /> continuously in an efficient and economical-manner, <br /> D.Not use grant funds to replace any financial support previously provided or assured from any other <br /> source.The Grantee agrees that the Grantee%level of expenditure for the Project shall be maintained <br /> and not reduced as a result of Grant Funds; <br /> E. Make the public facility or services available to all persons in Grantee's service area without discrimi- <br /> nation as to race,color,religion,sex,national origin,age,marital status,or physical or mental disability <br /> at reasonable rates,including assessments,taxes,or fees.Grantee may make modifications as long as <br /> they are reasonable and nondiscriminatory; <br /> F.To execute any agreements required by Grantor which Grantee is legally authorized to execute.If <br /> any such agreement has been executed by Grantee as a result of a loan being made toGrantee by <br /> Grantor contemporaneously with the making of this grant,that agreement applies equally to the grant <br /> and another identical agreement need not be executed In connection with this grant; <br /> G. Upon any default under its representations or agreements contained in this instrument,Grantee,at <br /> the option and demand of Grantor,will immediately repay to Grantor the-Grant Funds with any legally <br /> permitted interest from the date of the default.Default by the Grantee will constitute termination of the <br /> grant thereby causing cancellation of Federal assistance under the grant.The provisions of this Agree- <br /> ment may be enforced by Grantor,at its option and without regard to prior waivers of previous defaults <br /> by Grantee,by judicial proceedings to require specific performance of the terms of this Agreement or <br /> by such other proceedings in law or equity,In either Federal or State courts,as may be deemed <br /> necessary by Grantor to assure compliance with the provisions of this Agreement and the laws and <br /> regulations under which this grant is made; <br />
The URL can be used to link to this page
Your browser does not support the video tag.