My WebLink
|
Help
|
About
|
Sign Out
Home
NTC COU PUBLIC HEARING 2013-06-04 2012-2014 RE WID KONA OCEAN VIEW
ClerkCouncil
>
Council Records
>
Notices
>
2012-2014
>
Council
>
NTC COU PUBLIC HEARING 2013-06-04 2012-2014 RE WID KONA OCEAN VIEW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 8:45:31 AM
Creation date
5/22/2013 3:33:25 PM
Metadata
Fields
Template:
Notices
Notices - Type
NTC
Notices - Council Term
2012-2014
Notices - Description
Public Hearing
Notices - Legislative Body
COUNCIL
Meeting date
2013-06-04
Document Relationships
COM 0235.001 2012-2014
(Related)
Path:
\Council Records\Communications\2012-2014
RES 098 Draft 01 2012-2014
(Related)
Path:
\Council Records\Resolutions\2012-2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All interested persons are invited to attend and shall be afforded the opportunity to be heard. The <br />meeting place is accessible for persons with disabilities. Persons who need special accommodations <br />for this public hearing should call 961-8255 by May 28, 2013. Relay Users please call <br />711(961-8255) to contact our office. <br />2. Documents and Information to be Considered <br />The purpose of the Public Hearing is to consider the following documents and information relating <br />to the Improvement District: <br />Scope and Location of Special Improvements. The Special Improvements will consist generally of <br />the construction and installation of underground waterlines and fire hydrants within the <br />Improvement District, including the removal of existing meters and laterals and the installation of <br />new meters. The expected locations of the Special Improvements are identified on the Corrected <br />Map. <br />Estimated Cost of Special Improvements. Based on the Construction Bid and other estimated costs, <br />the total cost of designing, constructing and installing the Special Improvements (including related <br />administrative and financing costs), is estimated by the Hawaii County Manager -Chief Engineer of <br />the Department of Water Supply to be $1,569,369, of which $353,369 is expected to be funded by a <br />grant from the U.S. Department of Agriculture Rural Development, resulting in estimated net project <br />costs of $1,216,000. <br />Description of Assessment Units; Preliminary Assessment Roll. For purposes of the Improvement <br />District, the net project costs of the Special Improvements will be assessed by Hawaii County (the <br />"County") in equal amounts against all assessment units within the Improvement District, which will <br />consist of all duly subdivided parcels of land or condominium units within the Improvement District <br />bearing unique tax map key numbers, except for two excluded lots as indicated below. As identified <br />in the Preliminary Assessment Roll, the Improvement District currently consists of eighty-one (81) <br />assessment units, comprised of TMKs 7-2-008:1-41 (excluding lot 39, which is not part of the <br />Subdivision) and TMKs 7-2-09:1-42 (excluding lot 41, which is the road lot). The tax map key <br />numbers and street addresses of the current assessment units and the names and contact addresses of <br />the current owners are set forth in the Preliminary Assessment Roll. <br />Estimated Assessments. Based on estimated net project costs of $1,216,000 and eighty-one (8 1) <br />assessment units, the assessment for each assessment unit is currently estimated to be $15,012.35. <br />The County intends to issue general obligation bonds to finance all or a portion of the net project <br />costs of the Special Improvements. Assessments collected by the County will be used to pay or <br />reimburse the County for payments of principal and interest on such bonds and/or costs not financed <br />by the bonds. Unless paid in full, assessments will be payable in such annual installments as <br />determined by the Council, and each annual installment may be made payable in up to twelve equal <br />monthly or other periodic installments. A property owner's assessment may be paid to the Director <br />of Finance in full, without additional charges, at any time within 30 days after the date of the last <br />publication of the ordinance to set the Improvement District assessments. After this 30 -day period, <br />property owners will also be permitted to prepay the unpaid balance of their assessments in full, plus <br />a 3% premium on the amount to be prepaid (unless waived) and interest at the rate on the bonds until <br />they can be redeemed with the assessment prepayment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.