Laserfiche WebLink
WHEREAS, one to two acres of land are required to drill an exploratory well. If the <br /> exploratory well meets DWS requirements, DWS would be able to approve construction of a <br /> production well (Ocean View Well #2), an electrical control building, and a reservoir that can <br /> hold at least 1,000,000 gallons of water; and <br /> WHEREAS, development of Ocean View Well#2 would enable DWS to install an <br /> adequately-sized water main from the Ocean View Well #2 reservoir to connect with the existing <br /> water main from Ocean View Well #1; now, therefore, <br /> BE IT RESOLVED BY THE COUNCIL OF THE COUNTY OF HAWAII that the <br /> Water Board is urged to authorize the development of Ocean View Well #2, a reservoir, support <br /> facilities, and water main to connect with Ocean View Well #1 for Ocean View in its five-year <br /> plan, and further authorize the Department of Water Supply to engineer and construct Ocean <br /> View Well #2 and all accessory facilities. <br /> BE IT FURTHER RESOLVED that the Water Board is urged to authorize the <br /> acquisition of the land required for development of Ocean View Well #2 and accessory facilities, <br /> which land shall be placed in its ownership. The Water Board may authorize any financing <br /> mechanism from any source to obtain funding, including grants and bonds, any contractual <br /> means to pay for construction of the well, its components, its necessary materials, and complete <br /> any other necessary procedure, including acquisition of permits. <br /> BE IT FURTHER RESOLVED that the Planning Department is urged to collaborate in <br /> this endeavor by authorizing the subdivision of property as necessary and appropriate, to meet <br /> the requirements of DWS at no cost to the land owner to allow the County to acquire desired <br /> property in an expeditious manner. <br /> BE IT FURTHER RESOLVED that the Department of Public Works is urged to <br /> collaborate with DWS to allow road access from the road owner and issue permits, as necessary, <br /> at no cost to DWS to allow connection of the proposed Ocean View Well #2 via a buried and <br /> adequately-sized water main to the water main connected to Ocean View Well #1. <br /> BE IT FURTHER RESOLVED that the Office of Corporation Counsel is urged to <br /> collaborate with the Water Board and DWS to determine requirements to acquire legal title to <br /> property required by DWS for completion of this project, to obtain a Right-of-Entry for <br /> construction, to obtain an easement on any public or private road, if necessary, and to provide <br /> any legal assistance necessary to allow DWS to place the water main within the designated <br /> roadway and to pave over the water main with appropriate material. <br /> 2 <br />