My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2015-117 2014-2016
ClerkCouncil
>
Council Records
>
Ordinances
>
2015
>
ORD 2015-117 2014-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:48:44 PM
Creation date
1/12/2016 7:59:18 AM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2014-2016
Year
2015
Ordinance
117
Effective Date
12/22/2015
Document Relationships
BIL 109 Draft 01 2014-2016
(Related)
Path:
\Council Records\Bills\2014-2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The applicants successors or assigns shall be responsible for comylying with all <br />of the stated conditions of approval. <br />B. Prior to the issuance of a water commitment by the Department of Water Supply <br />(DWS), the applicant(s) shall submit the anticipated maximum daily water usage <br />calculations as prepared by a professional engineer licensed in the State of <br />Hawaii to the DWS. A water commitment deposit shall be paid to the DWS <br />within 180 days from the effective date of this ordinance in accordance with <br />Rule 5 of the Department of Water Supply's Rules and Regulations. The <br />applicant is responsible for maintaining valid water commitments to support the <br />proposed use until such time that required water facilities charges are paid in full. <br />C. The applicant shall construct necessary water system improvements as required by <br />the Department of Water Supply, which may include but not be limited to <br />installing a larger or additional water meter. <br />D. The applicants shall install a reduced pressure type backflow prevention assembly <br />within five (5) feet of the existing water meter and any additional water meters on <br />private property which must be inspected and approved by the Department of <br />Water Supply. <br />E. Construction of the proposed commercial development shall be completed within <br />five 5) years from the effective date of this amended ordinance. <br />F. Final Plan Approval No. 2987, issued February 15, 1995, is void. Prior to <br />construction, the applicants, successors or assigns shall secure Final Plan <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.