Laserfiche WebLink
A. The applicants, successors or assigns shall be responsible for complying with all <br /> of the stated conditions of approval. <br /> B. Prior to submitting plans for Plan Approval, the applicants shall secure Final <br /> Consolidation Approval to consolidate Tax Map Key Nos. 1-5-011:008 and 009 <br /> into one lot. <br /> C. Plan Approval shall be required prior to the construction or installation of any <br /> new structure or development, or any addition to an existing structure or <br /> development according to Section 25-2-71(a)of the Zoning Code. All <br /> application(s) for plan approval and sign permit(s) shall be reviewed for <br /> consistency with the Pahoa Village Design Guidelines according to Section 25-7- <br /> 42 of the Zoning Code. <br /> D. Prior to the issuance of a water commitment by the Department of Water Supply <br /> (DWS), the applicant(s)shall submit the anticipated maximum daily water usage <br /> calculations as prepared by a professional engineer licensed in the State of <br /> Hawaii to the DWS. A water commitment deposit shall be paid to the DWS <br /> within 180 days from the effective date of this ordinance in accordance with Rule <br /> 5 of the Department of Water Supply's Rules and Regulations. The applicants are <br /> responsible for maintaining valid water commitments to support the proposed use <br /> until such time that required water facilities charges are paid in full. <br /> E. The applicants shall install a reduced pressure type backflow prevention assembly <br /> within five(5) feet of the existing water meter and any additional water meters on <br /> private property, which must be inspected and approved by the Department of <br /> Water Supply. Installation of the backflow prevention assembly and relocation <br /> -3- <br />