Laserfiche WebLink
(B) Fulfillment of the need for public service demands created by the <br /> proposed use. <br /> A. The applicant, successors or assigns shall be responsible for complying with all of <br /> the stated conditions of approval. <br /> Water Supply.] The applicant shall construct necessary water system <br /> improvements as required by the Department of Water Supply(DWS),which may <br /> include, but not be limited to, the installation of a reduced pressure type backflow <br /> prevention assembly and improvements to meet DWS' commercial zoning fire <br /> flow standard of 2,000 GPM at the site for fire protection. The applicant is <br /> responsible for maintaining valid water commitments to support the proposed use <br /> until such time that r-.uired water facilities char es are ,aid in full. The <br /> applicant shall comply with all other applicable DWS policies and requirements. <br /> C. Construction of the proposed development shall be completed within five(5) <br /> years from the effective date of this [ordinance] amended ordinance. This time <br /> period shall include securing comments from the Kailua Village Design <br /> Commission and Final Plan Approval from the Planning Director in accordance <br /> with the Zoning Code. Plans shall identify proposed structure(s), fire protection <br /> measures, access roadway, driveway and parking stalls. The applicant shall <br /> provide adequate off-street parking and a turnaround before entering the County <br /> road right-of-way. Landscaping shall be indicated on the plans for the purpose of <br /> -2- <br />