Laserfiche WebLink
Law Offices of Yeh&Moore <br /> A Limited Liability Law Company <br /> Duane Kanuha,Director,Planning Department <br /> Myles Miyasato, Chairman, Windward Planning Commission <br /> February 4,2016 <br /> Page 3 <br /> shall occur prior to the issuance of occu.ancv Hermits for the <br /> respective development. <br /> E In conjunction with the development of the parcels abutting <br /> Kekuanaoa Street and Laukapu Street.the applicant shall provide <br /> full improvements to the project's frontage along Kekuanaoa Street <br /> and Laukapu Street consisting of,but not limited to,pavement <br /> widening with concrete curb, gutter and sidewalk, drainage <br /> improvements, and any required utility relocation,meeting with the <br /> approval of the Department of Public Works. The improvements <br /> shall be located within the future road widening setback,and shall <br /> be corn i leted .dor to issuance of occu Jane_I emits for the <br /> proposed development. <br /> F. PIn conjunction with the development of the parcels abutting <br /> Kekuanaoa Street and Laukapu Street.provide a minimum 20-foot <br /> corner radius (property line)at the intersection of the future road <br /> widening setback lines along Kekuanaoa Street and Laukapu <br /> Street. PIn conjunction with the development of the parcels <br /> abutting Kekuanaoa Street and Hinano Street.provide a 33-foot <br /> corner radius(conforming to the back edge of the existing <br /> sidewalk) at the intersection of the future road widening setback <br /> lines along Kekuanaoa Street and Hinano Street. <br /> As to concurrency requirements,the proposed development will not significantly increase <br /> the number of employees, and the improvements are expected to generate less than fifty peak <br /> hour trips with respect to traffic impacts. County water remains available through the existing <br /> 11/2 inch meter servicing the property. The property is outside of the tsunami evacuation zone. <br /> Nevertheless, outdoor warning sirens are within the vicinity of the property. <br /> In 2006,the estimated cost of the proposed new production and storage facility was <br /> $2.5 million. This cost has increased over time. In 2013,BIC constructed a two-story building <br /> on property north of and adjacent to the existing facility, which is located on TMK: (3)2-2- <br /> 034:104. This new building is currently meeting BIC's current needs to provide space for cold <br /> and warehouse storage. Additionally, past and current economic conditions,both locally and <br /> globally, are not favorable for constructing a new facility at this time. Tourism spending, <br /> including tourism from Japan which is a significant part of BIC's market,continues to be at a <br /> level which does not justify the planned improvements. <br />