Laserfiche WebLink
• <br /> DEPARTMENT OF LAND AND NATURAL RESOURCES <br /> ENGINEERING DIVISION <br /> LD/Russell Y.Tsuji • <br /> REF: Amendment to Change of Zone Ordinance No.06-114(REZ 05-000023) <br /> Rttwafl.016 <br /> COMMENTS <br /> () We confirm that the parcel/project site,according to the Flood Insurance Rate Map(FIRM),is <br /> located in Zones X. The National Flood Insurance Program does not regulate developments <br /> within Zones X. <br /> (X) The Preliminary data supporting the Flood Insurance Rate Map(FIRM)indicates that the <br /> project site is located in Zone X. The National Flood Insurance Program does not regulate <br /> developments within Zone X. <br /> () The correct Flood Zone Designation for the project site according to the Flood Insurance Rate <br /> Map(FIRM)is_ <br /> () The project must comply with the rules and regulations of the National Flood Insurance Program <br /> (NFIP)presented in Title 44 of the Code of Federal Regulations(44CFR),whenever development <br /> within a Special Flood Hazard Area is undertaken. If there are any questions,please contact the <br /> State NFIP Coordinator,Ms.Carol Tyau-Beam,of the Department of Land and Natural <br /> Resources,Engineering Division at(808)587-0267. <br /> Be advised that 44CFR indicates the minimum standards set forth by the NFIP. Your <br /> Community's local flood ordinance may prove to be more restrictive and thus take precedence <br /> over the minimum NFIP standards. If there are questions regarding the local flood ordinances, <br /> please contact the applicable County NFIP Coordinators below: <br /> () Mr.Mario Siu Li at(808)768-8098 of the City and County of Honolulu,Department of <br /> Planning and Permitting. <br /> () Mr.Carter Romero(Acting)at(808)961-8943 of the County of Hawaii,Department of <br /> Public Works. <br /> () Ms.Carolyn Cortez at(808)270-7253 of the County of Maui,Department of Planning. <br /> () Mr.Stanford Iwamoto at(808)241-4896 of the County of Kauai,Department of Public <br /> Works. <br /> () The applicant should include project water demands and infrastructure required to meet water <br /> demands. Please note that the implementation of State-sponsored projects requiring water service <br /> from the Honolulu Board of Water Supply system must first obtain water allocation credits from <br /> the Engineering Division before it can receive a building permit and/or water meter. <br /> () The applicant should provide the water demands and calculations to the Engineering Division so it <br /> can be included in the State Water Projects Plan Update. <br /> () Additional Comments: <br /> () Other: <br /> Should you have any questions,please call Mr.Rodney Shiraishi of the Planning Branch at 587-0258. <br /> Signed: '/* <br /> CAR,_:.CH i'�,CHIEF ENGINEER <br /> Date: '`2't( <br />