My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2017-008 2016-2018
ClerkCouncil
>
Council Records
>
Ordinances
>
2017
>
ORD 2017-008 2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 2:29:05 PM
Creation date
1/23/2017 2:03:44 PM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2016-2018
Year
2017
Ordinance
008
Effective Date
1/20/2017
Document Relationships
BIL 259 Draft 01 2014-2016
(Related)
Path:
\Council Records\Bills\2014-2016
REP PC 082 2016/11/15 (2014-2016)
(Related To)
Path:
\Council Records\Reports\2014-2016\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and adjustment of the Department of Water Supply's water system facilities, <br /> should they be necessary, shall take into consideration the future road widening <br /> strip along Kilauea Avenue. <br /> E. Should the applicant, successors or assigns develop a land use which the Planning <br /> Department, in consultation with the Department of Public Works, determines <br /> will generate over 50 peak hour trips, a Traffic Impact Analysis Report(TIAR) <br /> shall be submitted for review and approval by the Department of Public Works <br /> prior to Final Plan Approval. The applicant shall implement, when required by <br /> the Department of Public Works, at no cost to the County, any transportation <br /> system improvements to Kilauea Avenue that may be deemed necessary by the <br /> Department of Public Works. <br /> F. A ten (10) foot wide future road widening strip along the property's Kilauea <br /> Avenue frontage shall be subdivided and dedicated, at no cost to the County, <br /> when required by the Department of Public Works. The applicant shall provide <br /> their pro-rata share for the construction of full improvements to the entire property <br /> frontage along Kilauea Avenue consisting of,but not limited to, pavement <br /> widening with concrete curb, gutter and sidewalk, drainage improvements and any <br /> required utility relocation, meeting the approval of the Department of Public <br /> Works (DPW). This pro-rata share for roadway improvements specified in this <br /> condition shall be determined by the DPW and shall become due and payable to <br /> the County of Hawai`i within six (6) months from the date that formal notice is <br /> served upon the applicant, its successors or assigns by the DPW regarding a <br /> program for the installation of curb, gutter and sidewalk improvements along the <br /> frontage of Kilauea Avenue in proximity to the subject property. <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.