Laserfiche WebLink
Law Offices of Yeh & Moore <br /> A Limited Liability Law Company <br /> September 23, 2016 <br /> Page 5 <br /> Roads <br /> The TIAR, prepared June of 2016, is enclosed with this request. The TIAR assesses <br /> impacts to transportation facilities serving the Project area and in the immediate vicinity and general area <br /> of the Project. Id. At (d)(2). The TIAR includes projections for future growth in traffic for a minimum <br /> of five, ten and twenty years, and includes reasonable assumptions as to other and proposed <br /> development expected to impact the Project area. Id. at(d)(3); see Exhibit"G"to Use Permit <br /> application,p. 11, Fig. 5. Finally, the TIAR presents an assessment of the impacts of the Project on <br /> LOS and an evaluation of alternative plans for mitigation, including budgetary cost estimates of <br /> alternative plans. Id. at(d)(4); see Exhibit"G"to Use Permit application, pp. 6-7. <br /> The TIAR also meets the mitigation requirements in the HCC (HCC §25-2-46(e) and <br /> (f)) based upon Condition"E" of the Ordinance, requiring approval of the TIAR by DOT and the <br /> construction of mitigation measures required by the TIAR, including intersection improvements, if any, <br /> meeting with the approval of DPW and DOT, should the proposed intersection improvements not be <br /> commenced by DOT. Based on the TIAR, the Project and proposed accessory commercial center <br /> are projected to have "negligible vehicular traffic impacts" at the East Kahaopea Street and Kanoelehua <br /> Avenue intersection and East Kahaopea Street and Awapuhi Street intersection and adjacent <br /> roadways. Exhibit "G"to Use Permit application, p. 14. Traffic generated by Hilo Senior Housing is <br /> expected to be less intense than other types of residential uses. Id. No exacerbation of the <br /> downstream congestion sporadically observed during existing peak hours is expected. Id. The Project <br /> will slightly increase traffic volumes on the East Kahaopea Street approach to the Kanoelehua Avenue <br /> and East Kahaopea intersection. Id. <br /> Based on the slight traffic increase to eastbound through movement and because the <br /> westbound is configured with a combined left/through bay,the TIAR recommends that the median <br /> pavement striping on East Kahaopea Street between the Puainako Center driveway/Olu Street and <br /> Kanoelehua Avenue be modified to provide for more vehicle queuing space for the eastbound left- <br /> turning and through traffic movement at Kanoelehua Avenue. In addition, it is recommended that the <br /> portion of the medium turn lane striping that serves the eastbound/left through movement at Kanoelehua <br /> Avenue be lengthened and the left-turn lane serving traffic turning into Olu Street be shortened. Id., <br /> Fig. 6, p. 15 (illustrating the recommended lane striping modification). <br /> Water <br /> The Department of Water Supply has determined that it can meet the water <br /> requirements of the Project and issue water commitments using the existing eight(8) inch waterline <br /> located along East Kahaopea Street, thus satisfying HCC §25-2-46(m) as to water concurrency <br /> standards. <br />