Laserfiche WebLink
Valerie T. Poindexter, Council Chair <br />and Members of the County Council <br />Page 5 <br />spaces will likely support thirty employees. Clientele is estimated at two customers per <br />business per hour, for a total of an estimated forty vehicular trips in the AM and PM peak <br />hours. This is approximately the same peak AM and PM traffic flow that was experienced <br />at this parcel when it was operating as a pre-school for nearly twenty years. The estimate <br />of 40 trips is below the 50 vehicular movement threshold for a full Traffic Impact <br />Analysis Report (TZAR), however, to be consistent with the concurrency requirements of <br />the Zoning Code, a condition of approval will require submittal of a TIAR should a <br />different land use be developed that would generate over 50 peak hour trips. The <br />applicant will be responsible for constructing any improvements identified in the TIAR <br />required by the Department of Public Works. <br />According to the Department of Water Supply (DWS), there is an existing 24 -inch <br />waterline within Ho`ohana Street and the parcel is currently serviced by a 1% -inch meter <br />which is limited to an average daily usage of 2,400 gallons, or 6 units of water. DWS <br />requests that the applicant submit estimated maximum daily water usage calculations for <br />the proposed project to determine if additional water and improvements will be required. <br />If additional water is required, the applicant will need to obtain an allocation of water <br />units from Tokyu Corporation, subject to written consent of the Water Board. Finally, the <br />applicant will be required to install a reduced pressure type backflow prevention assembly <br />within five (5) feet of the meter and any other improvements as required by DWS. These <br />requirements will be added as conditions of approval. <br />The Mauna Lani Resort has a privately owned and operated wastewater collection <br />and treatment system and there is a sewer line located alongside Ho`ohana Street fronting <br />the subject property. The applicant plans to either remove an existing septic system that <br />served the former school building and connect to the existing sanitary sewer system, or <br />install an individual wastewater system meeting with the requirements of the State <br />Department of Health. This will be added as a condition of approval. All other essential <br />utilities or services are available to the property. <br />There is no severe geological or topographical problem for the property that . <br />cannot be properly rectified or which would render the land unusable. The property is <br />located in Zone "X", an area determined by FEMA to be located outside of the 500 -year <br />floodplain. <br />The request is not contrary to Chapter 205A, Hawaii Revised Statutes, <br />relating to Coastal Zone Management Area. The property is situated within the <br />Special Management Area. It is located approximately 4,056 feet from the nearest <br />