My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0443.000 2016-2018
ClerkCouncil
>
Council Records
>
Communications
>
2016-2018
>
COM 0443.000 2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 11:34:03 AM
Creation date
9/6/2017 2:37:21 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2016-2018
Communication
0443
Point
000
Author
Wilfred M. Okabe, Managing Director, Office of the Mayor
Communications - Referred To
PC
Document Relationships
AGE COUNCIL 2017/10/04 2016-2018
(Related)
Path:
\Council Records\Agendas\2016-2018\Council
AGE COUNCIL 2017/10/18 2016-2018
(Related)
Path:
\Council Records\Agendas\2016-2018\Council
AGE PC 2017/09/19 (2016-2018)
(Related To)
Path:
\Council Records\Agendas\2016-2018\Planning Committee (PC)
BIL 067 Draft 01 2016-2018
(Related)
Path:
\Council Records\Bills\2016-2018
REP PC 031 2017/09/19 (2016-2018)
(Related To)
Path:
\Council Records\Reports\2016-2018\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I _ <br /> N. The applicant shall comply with all County,State and Federal laws,rules, <br /> regulations and requirements. <br /> 0. An annual progress report shall be submitted to the Planning Director prior <br /> to the anniversary date of enactment of the ordinance. The report shall <br /> include,but not be limited to,the status of the development and the extent <br /> to which the conditions of approval have been satisfied. This condition <br /> shall remain in effect until all of the conditions of approval have been <br /> satisfied and the Planning Director acknowledges that further reports are <br /> not required. <br /> P. An initial extension of time for the performance of conditions within the <br /> ordinance may be granted by the Planning Director upon the following <br /> circumstances: <br /> 1. The non-performance is the result of conditions that could not have <br /> been foreseen or are beyond the control of the applicant,successors <br /> or assigns, and that are not the result of their fault or negligence. <br /> 2. Granting of the time extension would not be contrary to the <br /> General Plan or Zoning Code. <br /> 3. Granting of the time extension would not be contrary to the <br /> original reasons for the granting of the change of zone. <br /> 4. The time extension granted shall be for a period not to exceed the <br /> period originally granted for performance(i.e.,a condition to be <br /> performed within one year may be extended for up to one <br /> additional year). <br /> -5- <br /> { f' <br />
The URL can be used to link to this page
Your browser does not support the video tag.