Laserfiche WebLink
23. Public Access: There is no record of a designated public access to the shoreline or <br /> mountain areas that traverses the property. <br /> 24. Traffic Impacts: The concurrency section of the Zoning Code states that a traffic study <br /> is required whenever a proposed development will generate over 50 peak hour trips. <br /> There is no land use category for a combined government medical and offices building in <br /> the Institute of Transportation Engineers Trip Generation Manual. Based on similar land <br /> uses, it is estimated that about 48 trips during the peak hour periods will be generated. <br /> Thus, a Traffic Impact Analysis Report is not required. <br /> PUBLIC UTILITIES AND SERVICES <br /> 25. Access: Ingress access to the project site is proposed from East Kawili Street. Egress <br /> from the project site is proposed from Hinano Street. For the subject property and the <br /> adjacent TMK: (3)2-2-050:038, a common access easement "A" and "B"was recorded in <br /> 2013 for ingress purposes from East Kawili Street, which met Condition D of the original <br /> Ordinance. (P.D. Exhibit 3 —June 5, 2013 Recorded Grant of Easement Documents) <br /> 26. Water: The subject parcel does not have current water service with the Department of <br /> Water Supply(DWS). County water can be made available from an existing 8-inch <br /> waterline along Hinano Street or Kawili Street, fronting the subject parcel, in accordance <br /> with the DWS's existing water availability conditions. The applicant is required to <br /> submit the anticipated maximum daily water usage calculations for the proposed project, <br /> prepared by a professional engineer licensed in the State of Hawai`i for review and <br /> approval. DWS will determine the appropriate service lateral and meter size required <br /> based on the water demand calculations. <br /> 27. Wastewater: According to the Department of Environmental Management-Wastewater <br /> Division records, the subject property was connected to the County sewer on <br /> September 30, 2013. This met Condition J of the original Ordinance. <br /> 28. Solid Waste: There are no municipal waste collection services in the County. All solid <br /> waste generated by the development will require private disposal at the Hilo landfill or <br /> other designated landfill sites as required by the County. Condition K requires a Solid <br /> Waste Management Plan. <br /> -5- <br />