My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 001 Draft 01 2018-2020
ClerkCouncil
>
Council Records
>
Bills
>
2018-2020
>
BIL 001 Draft 01 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 3:01:09 PM
Creation date
12/12/2018 1:28:11 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2018-2020
Bill/Resolution
001
Draft
01
Introducer
Ashley L. Kierkiewicz, Council Member
Referred To
PC
Action 1
PC-1: Recommended passage on first reading - 1/8/19.
Action 2
Council: Bill 1 amended to Draft 2 - 1/23/19
Document Relationships
AGE COUNCIL 2019-01-23 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Council
AGE PC 2019/01/08 2018-2020
(Related)
Path:
\Council Records\Agendas\2018-2020\Planning Committee (PC)
COM 0013.000 2018-2020
(Related To)
Path:
\Council Records\Communications\2018-2020
REP PC 001 2019/01/08 2018-2020
(Related)
Path:
\Council Records\Reports\2018-2020\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Subdivision or Final Plan Approval, whichever is applicable, shall be secured from <br /> the Planning Director for any of the above uses prior to the issuance of any land alteration <br /> permits for any development phase in the Kaupulehu Project District. <br /> J. Construction of the residential units, commercial development, golf course and other <br /> related improvements shall commence only after Final Subdivision Approval and Final <br /> Plan Approval has been secured. <br /> K. The applicant shall provide assurance satisfactory to the Department of Water Supply and <br /> the Planning Director, upon consultation with the State Department of Health and <br /> Department of Land and Natural Resources, that water sources of sufficient quality and <br /> quantity has been established. Such satisfactory assurance can be met by the actual <br /> drilling and testing of a well site of the water source or by the submittal of a hydrological <br /> study certifying that a water sources of sufficient quality and quantity can be established <br /> at the designated locations. <br /> L. Upon compliance with Condition K, the actual development of the water source and its <br /> P p p <br /> water transmission and distribution system shall be developed in conjunction with the <br /> subdivision approval process. Final inspection to the residential structures shall not be <br /> issued until the approved water source is developed and its transmission and distribution <br /> system for such source to the subject property has been constructed. Residential building <br /> permits may be issued for model home complexes, provided that such model homes will <br /> not be occupied until the approved water source is developed. <br /> M. The interior roadway requirements for the Kaupulehu Project District shall be designed to <br /> resort standards as allowed by the Subdivision Code and as represented in Section 3.3.1 <br /> of the applicant's Project District Application. <br /> -6- <br /> I � <br />
The URL can be used to link to this page
Your browser does not support the video tag.