Laserfiche WebLink
Because of its location., this proi a -et uAl provide a service, that can be made <br />reasonably accessibk! to the jmmecli2te neighborhoods and surround <br />commercial and industrial areas. The required infrastructure ® if needed — will <br />I t J <br />be implerneented by the, applicant to nnitigate potential irnpact of this proiect. <br />S. Irreversible and IrretrieWible Ct,,nintment of Resources <br />The oi-ea of the neques-ted rezormlE lhas aiready been exterasively disturbed. As <br />.1 <br />Such, theof nziturafl or other rano urces (such as botanical, <br />avllfaunal, and archasological), vfo,�4id rot. �ppear to be significan't. <br />C ImitigaVve Measures <br />The applicant Intends to rprovideairy required a and on-site infrastructure in <br />conjunction with the. development of this prollect. These will inciude on-site <br />drainage system , landscaping, road, water and 1,Pjastewater improvements in <br />needed. Ai of these will be clone irs conjunction 1.Ajith the permitting and permit <br />'tr <br />implementation phases ol'this project, Oiff-si _- traffic -related improvernent sat <br />Manono Street fronting the property will also be provided. If need, this will <br />consist of curb, gutter, and sidevialk section fronting the property. <br />If any'Madvartent archaeological discoveries are Made during any phase of this <br />Project,11.1he Planning departlrnamt will be notified, and appropriate mitigation <br />will be taken before wark is nasurned. <br />I.andscapingwill also be, Incorperalted within the pro"ect site, as well as along <br />�2 J <br />its baunclaries. The ka-ndscapirg,-, would be consistent with the planning <br />Department's landscaping ruLes. <br />)D. Alternative to tL he <br />I. Y__Q l'-rc; J�ect <br />_ <br />Under the status quo alternative, the site would remain in its present <br />vacant, cleared use. <br />