Laserfiche WebLink
those upgrades would have to be made. So, I think when the engineers did a preliminary <br /> estimate in the beginning, that I think is in my estimation right now and I'm not an engineer, I <br /> think it's a conservative estimate. It will probably be much higher. <br /> AU: Okay, thank you. <br /> CLARKSON: Any further questions? <br /> RAFFIPIY: Mr. Chairman, I have one,'one question for Mr. Fuke. In your statement, you were <br /> talking about, you know, when you made mention something about when the developers or <br /> whoever is going to start owning this property is that they are going to start, that they can start <br /> talking about road improvement and stuff like that. I don't know if I, if I get it right. How did <br /> you—can you say that again? In your opening statement you were talking about road <br /> improvements and they can discuss that when ownership,taking over the properties and stuff I <br /> don't know if I get it right. <br /> FUKE: Okay, maybe, sorry, even my wife get hard time understand me, so I'm very sorry, but if <br /> I can kind of like, you know, restart again. So, as part of the, part of the subdivision, you know, <br /> process based on the condition that the staff has recommended,-is that they're going to have to, <br /> you know, like redraw the map, and whenthey redraw the map, the map is going to have to show <br /> like a County dedicable standard road that connects to all edges of the property. Then, the map <br /> would also have to reflect the setting aside of the land for the Clem Akina Park expansion and <br /> also for the cemetery. The actual size of the dedication for the Clem Akina Park and the <br /> cemetery still, you know, needs to be worked out, and that will be worked out in conjunction <br /> with the subdivision review process, <br /> RAFFIPIY: What is the plan for the roadways? <br /> FUKE: Okay, so the way that the condition reads like the road that goes, you know, like from <br /> Wainaku Street all the way up, you know, up to the top, that's going to have to be built to <br /> County dedicable standards. And, then the road that goes to the Hamakua side and also the Hilo <br /> side, you know, that also has to be built to County dedicable standard. And, so, as I mentioned <br /> earlier, I think that's very good because, you know, if it were kept in private, and you have the <br /> adjoining property owner develop something, then they can't get access to it, yeah. <br /> RAFFIPIY: Thank you,thank you. <br /> YEE: I'd like to just add. So, one reason we want connectivity to, to all the edges is otherwise if <br /> we didn't look for future connectivity, we would be creating one giant cul-de-sac, right? And, <br /> that's not what we want. <br /> AGUINALDO: Mr. Chair, I have a question. Adding onto Dean's question for you, on the <br /> construction timetable and cost, you talked about dedicated number, "x" amount of number <br /> given for roadway, drainage, water, and wastewater. Are you including also for the utilities, <br /> meaning power? To that certain point of your 30 lots? <br /> 14 <br />