Laserfiche WebLink
Hawaii County Energy Code Bill <br /> Annotated Draft <br /> 11127119 <br /> they ura J <br /> Construction documents and other supporting data shall be submitted to indicate <br /> compliance with this code. The construction documents shall be prepared design <br /> approved, and observed by a duly registered licensed professional as required by <br /> chapter 464, Hawaii Revised Statutes and in accordance with the provisions of <br /> chapter 5, Hawaii County Code. The licensed professional shall certify via a signed <br /> statement on the plans, that the project complies with this code. <br /> Exception: Any building work that is not required to be prepared designed, <br /> approved, or observed by a licensed professional architect or engineer pursuant to <br /> chapter 464, Hawaii Revised Statutes, shall be certified by the owner." <br /> Comments: <br /> A. State Justification: Standard administrative code language. <br /> B. See State ECC at§3-181.1-7, HAR, Kauai County at§12-6.4(2), KCC, <br /> and Maui County at§16.16B.C103.1, MCC. <br /> (5) Subsections C103.3.2 and C103.3.3 of the International Energy Conservation Code <br /> are deleted in their entirety. <br /> "[ <br /> w-hieh a lawfid permit has been hefetofefe issued of athefwise lawfully authofized-, <br /> a*d the eenstfuetion of whieh has been pursued in good faith within 180 days af4ef <br /> the effeetive date of this eede and has not been abandoned. <br /> C103.3.3 Phased approval. The eode offieial shall ha-ve the atAhafity to <br /> pfavided adequate infaftnation and detailed statemetAs ha-,Xe been filed eeffiplying <br /> with all peftinerA fequifemeflts of this eade. The holders of such pefmit shall pfeeeed <br /> staff, will -e . „toil " <br /> Comments: J <br /> A. These are administrative provisions that are already addressed elsewhere <br /> in the code. <br /> B. Hawai`i County's version of this addition is consistent with the version <br /> adopted by Kauai County. See: §12-6 4(31), KCC. <br /> 5 <br />