My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2020-010 2018-2020
ClerkCouncil
>
Council Records
>
Ordinances
>
2020
>
ORD 2020-010 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 1:36:10 PM
Creation date
2/5/2020 1:34:55 PM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2018-2020
Year
2020
Ordinance
010
Effective Date
2/4/2020
Document Relationships
BIL 126 Draft 01 2018-2020
(Related)
Path:
\Council Records\Bills\2018-2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equal to 2.4, and the dynamic glazing is automatically controlled to modulate the <br /> amount of solar gain into the space in multiple steps. Dynamic glazing shall be <br /> considered separately from other fenestration, and area-weighted averaging with other <br /> fenestration that is not dynamic glazing shall not be permitted. <br /> Exception: Dynamic glazing is not required to comply with this section when <br /> both the lower and higher labeled SHGC already comply with the requirements of <br /> Table R402.1.2." <br /> (37) Subsection R402.4.1.2 of the International Energy Conservation Code is amended to <br /> read as follows: <br /> "R402.4.1.2 Testing. The building or dwelling unit [shall] may be tested and verified <br /> as having an air leakage rate not exceeding five air changes per hour in Climate <br /> Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing <br /> shall be conducted in accordance with ASTM E 779 or ASTM E 1827 and reported at <br /> a pressure of 0.2 inch w.g. (50 Pascals). [Where required by the code official, testing <br /> shall be conducted by an approved third party. A written report of the results efthe <br /> test shall be signed by the party conducting the test and provided to the code official.] <br /> Testing shall be performed at any time after creation of all penetrations of the <br /> building thermal envelope. <br /> During testing: <br /> 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not <br /> sealed, beyond the intended weatherstripping or other infiltration control <br /> measures. <br /> 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers <br /> shall be closed, but not sealed beyond intended infiltration control measures. <br /> 3. Interior doors, if installed at the time of the test, shall be open. <br /> 4. Exterior doors for continuous ventilation systems and heat recovery <br /> ventilators shall be closed and sealed. <br /> 5. Heating and cooling systems, if installed at the time of the test, shall be turned <br /> off. <br /> 6. Supply and return registers, if installed at the time of the test, shall be fully <br /> open." <br /> (3 8) A new subsection R403.5.5 is added to the International Energy Conservation Code <br /> to read as follows: <br /> "R403.5.5 Solar water heating. Solar water heating systems are required for new <br /> single-family residential construction pursuant to section 196-6.5, Hawai`i Revised <br /> Statutes. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.