My WebLink
|
Help
|
About
|
Sign Out
Home
2019-05-22 EMC Meeting Agenda and Director's Informational Report
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2010-2019
>
2019
>
2019-05-22 EMC Meeting Agenda and Director's Informational Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 9:55:07 AM
Creation date
5/15/2019 9:53:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jun 2019 <br />Totals 33,425.18 40,079.47 <br /> <br />The above table is to include data on the waste disposed of in the landfill (not the <br />greenwaste or recycling data). <br /> <br />WASTEWATER DIVISION PROJECTS AND UPDATES <br />1. COMPLIANCE <br />• TREATMENT AND DISPOSAL: No report <br />• COLLECTION SYSTEM: No report. <br /> <br />2. OPERATIONS <br />A. TREATMENT/COLLECTION SYSTEMS AND PUMPING STATIONS/ FORCE MAINS: <br />• Unscheduled repairs/upgrades/replacement of failing equipment due to age <br />and prolonged wear and tear continue where necessary throughout the <br />wastewater facilities. <br />B. SAFETY PRACTICES/TRAINING: <br />• WWD Administration continues to review and update the Emergency <br />Response Procedures and the Standard Safety Procedures and the weekly <br />safety meeting agendas. <br /> <br />3. ADMINISTRATION <br /> A. VACANT POSITIONS IN OPERATIONS: <br />• Temporary Trades Helper (Kona – 1 position; Hilo – 1 position): recruitment <br />in progress <br />• Sewer Maintenance Repairer (Kona – 1 temp and 1 permanent position): <br />recruitment in progress <br />• Operator I (Kona – 1 position, Hilo - 1 position): recruitment in progress. <br />• Operator II (Hilo - 1 position): recruitment in progress. <br />• Operator IV (Hilo - 1 position): recruitment in progress. <br />• Wastewater Treatment Plant Supervisor III (Kona – 1 position): recruitment <br />in progress. <br />• Operator Supervisor IV (Hilo – 1 position) <br />• Sanitary Chemist III (Hilo – 1 position) <br /> <br />B. VACANT POSITIONS AT RAILROAD OFFICE: <br />• Wastewater Deputy Division Chief: recruitment completed. New employee <br />begins on 06/03/19. <br />• Wastewater Project Coordinator: recruitment in progress. <br /> <br /> <br />9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.