Laserfiche WebLink
those upgrades would have to be made. So, I think when the engineers did a preliminary <br />estimate in the beginning, that I think is in my estimation right now and I'm not an engineer, I <br />think it's a conservative estimate. It will probably be much higher. <br />AU: Okay, thank you. <br />CLARKSON: Any further questions? <br />RAFFIPIY: Mr. Chairman, I have one, one question for Mr. Fuke. In your statement, you were <br />talking about, you know, when you made mention something about when the developers or <br />whoever is going to start owning this property is that they are going to start, that they can start <br />talking about road improvement and stuff like that. I don't know if I, if I get it right. How did <br />you—can you say that again? In your opening statement you were talking about road <br />improvements and they can discuss that when ownership, taking over the properties and stuff I <br />don't know if I get it right. <br />FUKE: Okay, maybe, sorry, even my wife get hard time understand me, so I'm very sorry, but if <br />I can kind of like, you know, restart again. So, as part of the, part of the subdivision, you know, <br />process based on the condition that the staff has recommended, is that they're going to have to, <br />you know, like redraw the map, and when they redraw the map, the map is going to have to show <br />like a County dedicable standard road that connects to all edges of the property. Then, the map <br />would also have to reflect the setting aside of the land for the Clem Akina Park expansion and <br />also for the cemetery. The actual size of the dedication for the Clem Akina Park and the <br />cemetery still, you know, needs to be worked out, and that will be worked out in conjunction <br />with the subdivision review process. <br />RAFFIPIY: What is the plan for the roadways? <br />FUKE: Okay, so the way that the condition reads like the road that goes, you know, like from <br />Wainaku Street all the way up, you know, up to the top, that's going to have to be built to <br />County dedicable standards. And, then the road that goes to the Hamakua side and also the Hilo <br />side, you know, that also has to be built to County dedicable standard. And, so, as I mentioned <br />earlier, I think that's very good because, you know, if it were kept in private, and you have the <br />adjoining property owner develop something, then they can't get access to it, yeah. <br />RAFFIPIY: Thank you, thank you. <br />YEE: I'd like to just add. So, one reason we want connectivity to, to all the edges is otherwise if <br />we didn't look for future connectivity, we would be creating one giant cul-de-sac, right? And, <br />that's not what we want. <br />AGUINALDO: Mr. Chair, I have a question. Adding onto Dean's question for you, on the <br />construction timetable and cost, you talked about dedicated number, "x" amount of number <br />given for roadway, drainage, water, and wastewater. Are you including also for the utilities, <br />meaning power? To that certain point of your 30 lots? <br />EXHIBIT A <br />14 <br />