Laserfiche WebLink
depicted the building. Ms. Schatz answered that that should be the area Safeway was leasing from <br /> the owner. She mentioned that although the PA did not cover this area, the plans should still have <br /> defined the lease limit lines in relation to the sidewalk. Chairman Roth made reference to Sheet 2, <br /> Site Plan, pointed to the dashed line noted "PROPOSED RETAINING WALL BY OTHERS," <br /> and asked how that would reconcile with the approved landscape plan. Ms. Schatz responded that <br /> the area would still be landscaped with a tree, low-line brush and mid-line hedges. Ms. Bugado <br /> commented that it seemed that the public would be seeing more of the building than what was <br /> depicted on the master signage plan drawings, which the applicant had provided as reference. <br /> Commissioner Hetherington asked whether the revised roof design where the flat portion appeared <br /> to be much larger was their final decision or not. Mr. Yamashiro responded that as he understood, <br /> it was the final decision because it was necessary to accommodate the under-roof structures. <br /> Commissioner Hetherington commented that he would understand there had to be extra space, if <br /> there was too much equipment, but that according to what was presented, it seemed to him that <br /> either roof design would work fine. <br /> Chairman Roth asked if the previous designer, Architects Hawaii, had communicated with the <br /> current architect the things the Commission had discussed with them. Ms. Schatz responded that <br /> there had been multiple meetings, and that the architect had been provided with all the previous <br /> Commission materials and conditions that had to be met. Mr. Conte explained that it seemed that <br /> Architects Hawaii had not had all the information at the time of their initial rendering;part of the <br /> reason why the height was raised was to make the roof structure with a lot of joists and mansard <br /> roof all around work properly, as well as to accommodate Safeway's specific furnishings <br /> underneath the joists. He further explained that there would also be condensing units and other <br /> equipment on the roof, which they wanted to make sure to screen from public view. <br /> Ms. Schatz was able to display on her iPad a close-up image of the landscape plan for the area <br /> questioned by Chairman Roth earlier, and agreed that there appeared to be some inconsistency. <br /> Chairman Roth repeated his question as to whether or not the edge of the gray area was the wall of <br /> the building. Ms. Schatz said that it was not necessarily the wall but was identified as the limit <br /> line of the tenant lease. In response to Chairman Roth's further inquiry for clarification, she said <br /> that the edge could be the wall but not the roof overhang. Chairman Roth pointed out that in that <br /> case the roof overhang would be halfway into the tree. Asked by Ms. Schatz, Mr. Conte stated <br /> that there were about 3-to 6- or 8-foot buffers between the building walls and the lease limit line; <br /> there was a retaining wall proposed along the facade fronting Henry Street, and the building would <br /> be located at least 6 feet from the retaining wall, with roof overhang around the entire building at <br /> 3 feet. <br /> There being no further questions for the applicant, Chairman Roth opened the floor for discussion <br /> with his comment that the previous design had had a little more of a residential scale, although <br /> paring the residential scale and the 10-foot plate was already a contradiction; therefore, he would <br /> question if it would make sense to allow a 2-plus feet height increase for this particular location. <br /> He also recalled that the pitch of the roofs had been one of the issues discussed during the first <br /> review because the plan at that time had shown an odd mix of different pitches, and that the initial <br /> approval had been on condition that all the pitched roofs would look like that of Building 1, which <br /> had probably been a 4/12 or 5/12 slope. He expressed his disappointment that the supplemental <br /> 4 <br />