My WebLink
|
Help
|
About
|
Sign Out
Home
2020-01 Performance Audit Report: Contingency Plans at County of Hawai'i's Department of Water Supply
PublicDocuments
>
Legislative Auditor
>
Audit Reports
>
County Auditor Reports
>
2020-01 Performance Audit Report: Contingency Plans at County of Hawai'i's Department of Water Supply
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 2:40:06 PM
Creation date
3/3/2020 12:03:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. DWS's 2017 contingency plans should be improved. <br />At the time several deep wells became inoperable in 2017, DWS did not have <br />any written contingency plans. In response to increasing number of out of service <br />wells, DWS developed and implemented three different contingency plans: <br />• Kona Operations Initial Plan (June 02, 2017) A hand-written plan that <br />contains instructions on procedures to take if two different scenarios exist. <br />➢ Scenario 1: Describes procedures if Kalaoa Well fails. <br />➢ Scenario 2: Describes procedures if Honokohau well or Kealeohu <br />well failed. This scenario uses the same procedures as scenario <br />one but with more "aggressive conservation measures" (No <br />measures were stated). <br />Department of Water Supply Contingency Plan Audit Results 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.