• Current Schedule: <br />10/2020: Complete Archaeology and Biology Field Studies <br />11/2020: Field Study/Literature Review (FSLR) to SHPD for Review <br />01/2021: Draft EA and Anticipated FONSI scheduled for OEQC publication <br />02/2022: Draft AIS to SHPD anticipated <br />05/2023: Section 6E and 106 concurrence anticipated from SHPD/SHPO <br />07/2023: Final EA publication <br />01/2024: AMP approval from SHPD <br />07/2025: WWTP and Phase 1 Collection System Design complete <br />09/2025: Anticipated advertisement for bids-Phase 1 Construction <br />07/2027: Naalehu LCCs closure – Phase 1 construction complete <br /> <br />B. PĀHALA LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Final EA/FONSI was published with OEQC on 03/08/20. Also, the Draft Final AIS <br />was submitted to SHPD on 02/26/20, and approved on 04/20/20. <br />• Subdividing WWTP land has been initiated with KSBE with land acquisition <br />negotiations to follow. Based on SHPD’s review and acceptance of the AIS, an <br />Archaeological Monitoring Plan (AMP) is required. AMP was submitted on <br />05/07/20 to SHPD for review/approval. <br />• The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies and partially by a federal EPA grant. <br />• Current Schedule: <br />05/2020: WWTP Site and Easement Appraisal Updated <br />11/2020: Final AMP <br />01/2021: WWTP Order of Possession (AOC milestone, not per schedule) <br />08/12/21: Submit Special Permit Application <br />03/23/22: WWTP and Phase 1 Collection System Design completion <br />04/30/22: Advertisement for bids-Phase 1 Construction <br />12/20/23: Pāhala LCCs closure <br /> <br />C. LONO KONA SEWER IMPROVEMENT DISTRICT: <br />• Construction has been completed. All mains have been installed. CCTV <br />inspection was completed on 11/06/19. Pre-final walk through was performed <br />on 10/30/19. Final walk through was conducted on 11/19/19. <br />• Letters to property owners signaling the start of the 180-day mandatory <br />connection requirement were mailed on 11/12/19. The letters state that hook- <br />up to the county sewer must be done by 05/10/20. Compliance deadline was <br />extended to 07/09/20 due to COVID-19. <br />• Current hookup count: 40 out of 112 TMKs have connected as of 06/12/20. <br />• USDA Rural Development has obligated loan and grant funds of $2,437,000 and <br />$4,024,800 respectively to this project. USDA’s Amendment 1 (dated 07/25/18) <br />provided additional loan and grant funding to cover cost overruns. An additional <br />loan of $3,699,000 and grant of $1,071,000 were added to the original <br />agreement. The low construction bid received was $8,531,814. <br /> <br />11 <br /> <br />