My WebLink
|
Help
|
About
|
Sign Out
Home
PD BACKGROUND (REZ 09-101)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2020
>
2020-07-02 Windward
>
Item #2 Dr. Brian Sugai (Amend REZ 09-101)
>
PD BACKGROUND (REZ 09-101)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 11:00:48 AM
Creation date
6/22/2020 11:00:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
calculations as recommended by a registered engineer, and a daily water <br /> commitment deposit in accordance with the "Water Commitment Guidelines <br /> Policy"to the Department of Water Supply within one hundred and eighty <br /> (180)days from the effective date of this ordinance. <br /> This has already been addressed and accommodated, enabling the issuance of <br /> the initial building permit for the project. <br /> C. The applicant shall install a reduced pressure type of backflow prevention <br /> assembly within five (5)feet of the water meter on private property, which <br /> must be inspected and approved by the Department of Water Supply. <br /> This is reflected in the construction plans for the pending building permit. <br /> This will be completed prior to the issuance of an occupancy permit for the <br /> building. <br /> D. Construction of the proposed improvements shall be completed within five (5) <br /> years from the effective date of this ordinance. This time period shall include <br /> securing Final Plan Approval from the Planning Director... Plans shall <br /> idents structures,fire protection measures, paved access and loading zones. <br /> Landscaping shall be indicated on the plans,for the purpose of mitigating any <br /> potential adverse noise and visual impacts to adjoining parcels. Landscaping <br /> shall be provided in accordance with the requirements of Planning <br /> Department's Rule No. 17(Landscaping Requirements). <br /> As noted above, Final Plan Approval was issued on June 8, 2011 (Exhibit B) <br /> and the corresponding building permit issued on November 7, 2011 (Exhibit <br /> C). However, while only limited site work was done, construction of the <br /> structure has not commenced. As such,the Applicant is requesting a 5-year <br /> time extension from the effective date of the amendment to complete the <br /> structure. <br /> E. Development of the properly shall be designed and constructed in a way to <br /> minimize obstruction of the scenic views of Hilo Bay and the Puna shoreline <br /> from Komohana Street. <br /> This has been addressed in conjunction with the review and ultimate approval <br /> of the plans via the Plan Approval process. <br /> F. Prior to the issuance of a Certificate of Occupancy, the applicant shall <br /> provide full improvements to the property's frontage along Komohana Street <br /> consisting of; but not limited to,pavement widening with curb, gutter and <br /> sidewalk, drainage improvements, and any required utility relocation, meeting <br /> with the approval of the Department of Public Works. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.