Laserfiche WebLink
The civil construction plans reflect these improvements fronting Komohana <br /> Street. (Exhibit G)These will be completed prior to issuance of the <br /> Certificate of Occupancy. <br /> G. Access shall be through Road and Utility Easement RU-11 at Komohana <br /> Street and shall be limited to right-turn in and right-turn out movements only. <br /> The access connection to Komohana Street shall conform to Chapter 22 <br /> (County Streets)of the Hawaii County Code. Prior to the issuance ofa <br /> Certificate of Occupancy, the applicant shall install "no left-turn"sign(s) and <br /> a triangular-shaped raised concrete barrier at the property access to prevent <br /> left-turns into and out of the access driveway. All improvements shall meet <br /> with the approval of the Department of Public Works. <br /> This restriction is reflected in the approved civil construction plans for the <br /> project. (See Exhibit G)The required improvements will be completed prior <br /> to issuance of the Certificate of Occupancy. <br /> H. Should the applicant submit plans to develop a land use beyond what is <br /> proposed in the application, which the Planning Department in consultation <br /> with the Department of Public Works determines will generate over 50 peak <br /> hour trips, a Traffic Impact Analysis Report (TZAR)shall be submitted for <br /> review and approval by the Department of Public Works prior to Final Plan <br /> Approval. The applicant shall implement when required by the Department of <br /> Public Works, at no cost to the County, any transportation improvements <br /> deemed necessary by the Department of Public Works. <br /> It was determined that no TIAR was needed and hence, Final Plan Approval <br /> was issued. (See Exhibit B)Should a revised or a new Plan Approval be <br /> required for any additional structure or improvements to the already approved <br /> one,the Applicant will comply accordingly. <br /> I. Streetlights and traffic control devices, as may be required by the Traffic <br /> Division, Department of Public Works, shall be installed by the applicant <br /> These are reflected in the approved civil construction plans associated with <br /> the pending building permit plans. The applicant will make those <br /> improvements prior to issuance of the Certificate of Occupancy. <br /> J. The applicant shall install wastewater disposal system(s) meeting with the <br /> requirements of the Department of Health prior to the issuance of a <br /> Certificate of Occupancy. <br /> Like the streetlights and traffic controls,the system is reflected in the pending <br /> building permit plans. The plans reflect the use of a septic system. The <br /> Applicant will complete the approved system before the Certificate of <br /> Occupancy is applied for. <br /> 4 <br />