My WebLink
|
Help
|
About
|
Sign Out
Home
2020-07-22 EMC Meeting Agenda and Director's Informational Report
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2020
>
2020-07-22 EMC Meeting Agenda and Director's Informational Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 1:53:35 PM
Creation date
7/15/2020 1:53:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 2020 3,425.91 10,383.02 <br />Feb 2020 3,001.76 9,124.69 <br />Mar 2020 3,875.57 10,105.49 <br />Apr 2020 3,927.34 8,727.04 <br />May 2020 3,958.37 8,457.72 <br />Jun 2020 3,848.47 8,327.59 <br />Totals 40,460.79 88,796.48 <br /> <br />The above table is to include data on the waste disposed of in the landfill (not the <br />greenwaste or recycling data). <br /> <br />WASTEWATER DIVISION PROJECTS AND UPDATES <br /> <br />1. COMPLIANCE <br />A. TREATMENT AND DISPOSAL: <br />• 05/01/20: Hilo WWTP NPDES (renewal) received Final Permit from DOH. DOH <br />removed the strict Water Quality based effluent limits on nitrogen. <br />• 11/08/19: Kaloko WWTP UIC Permit Annual O&M Inspection. WWTP received <br />an unacceptable O&M rating. Consultant contract executed based on DOH <br />requirements. Consultant is working on providing Basis of Design Review/Mass <br />Balance on 25,000 gpd operating conditions. <br />• 05/15/20: WWD received an RFI Letter from DOH for the Pretreatment Program <br />that is in place for the Hilo WWTP. Response to the RFI is required by 07/31/20. <br /> <br />B. COLLECTION SYSTEM: No report. <br /> <br />2. OPERATIONS <br />A. TREATMENT/COLLECTION SYSTEMS AND PUMPING STATIONS/ FORCE MAINS: <br />Unscheduled repairs/upgrades/replacement of failing equipment due to age and <br />prolonged wear and tear continue where necessary throughout the wastewater <br />facilities. <br /> <br />B. SAFETY PRACTICES/TRAINING: <br />WWD administration continues to review and update the Emergency Response <br />Procedures and the Standard Safety Procedures and the weekly safety meeting <br />agendas. <br /> <br />3. ADMINISTRATION <br />A. VACANT POSITIONS IN OPERATIONS: <br />• Operator IV (Hilo – 1 position): recruitment in progress. <br />• Operator Supervisor III (Kona – 1 position): interviewed two candidates; <br />selection is in progress. <br />9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.