Laserfiche WebLink
<br />• Assistant WWTPO (Kona – 1 position): recruitment in progress. <br />• Lead Electrician (Hilo): recruitment in progress. <br /> <br />B. VACANT POSITIONS AT RAILROAD OFFICE: <br />• Civil Engineer IV (2 positions): recruitment reinitiated. <br />• Civil Engineer V (1 position): no internal recruits; will open recruitment. <br />• Projects Coordinator (1 position): recruitment in progress. <br /> <br />C. NEW POSITIONS (created in FY 19/20) <br />• Environmental Management Engineer (Hilo): creating position. <br />• Database Analyst (Hilo): completing position creation. <br />• GIS Analyst I (Hilo): completing position creation. <br />• Program Manager (Reuse Spec I) (Kona): will begin recruit in FY21. <br />• WW Plant Maintenance Mechanic (Kona): packet submitted to Managing <br />Director’s office. <br />• WWTPO IV (Kona): packet submitted to Managing Director’s office. <br />• WWTPO IV (Kona): packet submitted to Managing Director’s office. <br />• Plant Electrician/Electronics Repairer (Kona): packet submitted to Managing <br />Director’s office. <br /> <br />4. WASTEWATER CAPITAL IMPROVEMENTS <br />A. NĀ‘ĀLEHU LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Final land selection is still in progress. The state EA process required prior to <br />purchase of land for the treatment/disposal facility and project construction is <br />under way. Initial archaeological, flora and fauna checks and WWTP site design <br />are in progress. Revised AOC anticipated completion of the final EA is projected <br />no later than 07/23/21. EPA accepted a revised completion date of 08/27/23. <br />• The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies. <br />• Current Schedule: <br />10/2020: Complete Archaeology and Biology Field Studies. <br />11/2020: Field Study/Literature Review (FSLR) to SHPD for Review. <br />01/2021: Draft EA and Anticipated FONSI scheduled for OEQC publication. <br />02/2022: Draft AIS to SHPD anticipated. <br />05/2023: Section 6E and 106 concurrence anticipated from SHPD/SHPO. <br />07/2023: Final EA publication. <br />01/2024: AMP approval from SHPD. <br />07/2025: WWTP and Phase 1 Collection System Design complete. <br />09/2025: Anticipated advertisement for bids-Phase 1 Construction. <br />07/2027: Nāālehu LCCs closure ʻ– Phase 1 construction complete. <br /> <br />B. PĀHALA LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Final EA/FONSI was published with OEQC on 03/08/20. Also, the Draft Final AIS <br />was submitted to SHPD on 02/26/20 and approved on 04/20/20. <br />10 <br /> <br />