• Subdividing WWTP land has been initiated with KSBE with land acquisition <br />negotiations to follow. Based on SHPD’s review and acceptance of the AIS, an <br />Archaeological Monitoring Plan (AMP) is required. AMP was submitted on <br />05/07/20 to SHPD for review/approval. <br />• The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies and partially by a federal EPA grant. <br />• Current Schedule: <br />05/2020: WWTP Site and Easement Appraisal Updated. <br />11/2020: Final AMP. <br />01/2021: WWTP Order of Possession (AOC milestone, not per schedule). <br />08/12/21: Submit Special Permit Application. <br />03/23/22: WWTP and Phase 1 Collection System Design completion. <br />04/30/22: Advertisement for bids-Phase 1 Construction. <br />12/20/23: Pāhala LCCs closure. <br /> <br />C. LONO KONA SEWER IMPROVEMENT DISTRICT: <br />• Construction has been completed. All mains have been installed. CCTV <br />inspection was completed on 11/06/19. Pre-final walk through was performed <br />on 10/30/19. Final walk through was conducted on 11/19/19. <br />• Letters to property owners signaling the start of the 180-day mandatory <br />connection requirement were mailed on 11/12/19. The letters state that hook- <br />up to the county sewer must be done by 05/10/20. Compliance deadline was <br />extended to 07/09/20 due to COVID-19. <br />• Current hookup count: 49 out of 112 TMKs have connected as of 07/09/20. <br />• USDA Rural Development has obligated loan and grant funds of $2,437,000 and <br />$4,024,800 respectively to this project. USDA’s Amendment 1 (dated 07/25/18) <br />provided additional loan and grant funding to cover cost overruns. An additional <br />loan of $3,699,000 and grant of $1,071,000 were added to the original <br />agreement. The low construction bid received was $8,531,814. <br /> <br />D. KEALAKEHE WWTP EFFLUENT R-1 UPGRADE: <br />• The Archaeological Inventory Survey (AIS) that is required by SHPD is proceeding. <br />The AIS report to SHPD was completed in early December 2019. SHPD is <br />requiring a 30-day consultation period due to cultural sites that have been <br />identified. The 30-day consultation period was extended because of comments <br />received by DLNR’s Historic Trails branch. The findings from the 30-day <br />consultation period have been incorporated into the AIS. The completed AIS was <br />submitted to SHPD on 03/20/20. SHPD’s review comments were received <br />07/08/20. <br />• The project has been placed “on-hold” by the mayor because of funding issues <br />and the Maui County (Lahaina WWTP injection wells) U.S. Supreme Court <br />appeal. <br />• With the SCOTUS decision, WWD has begun work to award a contract for a <br />consultant to perform a tracer/dye study to determine if KWWTP effluent <br />11 <br /> <br />