Laserfiche WebLink
1 <br /> f ' <br />) <br />( <br /> 3. All development generated runoff shall be disposed of on-site and shall not be <br /> directed toward any adjacent properties. A drainage study shall be prepared by a <br /> licensed civil engineer and submitted to the Department of Public Works prior to <br /> issuance of a construction permit. Any recommended drainage improvements shall be <br /> constructed meeting with the approval of the Department of Public Works prior to <br /> receipt of a Certificate of Occupancy. <br /> Applicant Response: Applicant will comply with the recommended requirements. <br />( The drainage facilities were installed in phase one of the project. The current phase <br /> directs all runoff to the existing onsite drainage facilities. <br /> f 6. The applicant shall comply with Chapter 27 - Flood Control, of the Hawaii County <br /> Code. <br /> Applicant Response: Applicant will comply with the recommended requirements. <br /> 7. For encroachments in or alterations to the AE flood zone, the applicant shall submit <br /> a flood study prepared by a licensed professional civil engineer. If required, the <br /> applicant shall submit for a Conditional Letter of Map Revision (CLOMR) to the Federal <br /> Emergency Management Agency (FEMA) prior to the issuance of any construction <br /> permit. If required, the applicant shall obtain a Letter of Map Revision (LOMR) prior to <br /> the issuance of Certificate of Occupancy. <br /> Applicant Response: August 3, 2020, after review of the LOMR requirements <br /> applicant has received approval from the County of Hawaii Engineering Division. <br /> 8. During construction, measures shall be taken to minimize the potential of both <br /> fugitive dust and runoff sedimentation. Such measures shall be in compliance with <br /> construction industry standards and practices utilized during construction projects of <br /> the State of Hawaii. <br /> Applicant Response: Applicant will comply with the recommended requirements. <br /> 9. All earthwork and grading shall conform to Chapter 10, Erosion and Sediment <br /> Control of the Hawaii County Code. <br /> Applicant Response: Applicant will comply with the recommended requirements. <br /> 10. All driveway connections to Alii Drive shall be at a location approved by the <br /> Department of Public Works and shall conform to Chapter 22, County Streets, of the <br /> Hawaii County Code. <br /> Applicant Response: There are no new driveway connections to Ali'i Drive planned. <br /> Applicant will use existing church driveway approved in first phase of construction. <br /> 11. The applicant shall install street lights, signs and markings meeting with the <br /> approval of the Department of Public Works - Traffic Division. <br /> Applicant Response: Applicant will comply with the recommended requirements. <br /> 12. An All Hazards Emergency Response Plan shall be submitted to the Hawaii <br /> County Civil Defense Agency for review and approval prior to the issuance of a <br /> Certificate of Occupancy. <br /> Applicant Response: Applicant will comply with the recommended requirements. <br /> 4 <br />