constructed in 1850, was demolished after sustaining significant structural damage during <br /> the October 15, 2006 earthquake. Following approval of SMA Use Permit <br /> No. 10-000044, construction of the new church began in December 2012. The first phase <br /> of construction included the main church building,parish hall foundation, surrounding <br /> landscaping and parking. This initial phase was completed in early February 2015. The <br /> first mass in the newly constructed church was held on March 15, 2015. The second <br /> phase of construction was postponed allowing the parish to work on fundraising to pay <br /> off the initial debt. Unanticipated delays prolonged debt reduction efforts, though the debt <br /> was eventually paid off. Subsequently, the parish decided to reduce the scope of the <br /> second phase of construction as follows: <br /> • Reduce the height of the Parish Hall from 2-stories to 1-story, while maintaining <br /> the design and appearance of the existing church building. <br /> • Eliminate the Rectory Building initially proposed to be located in the northwest <br /> corner of the subject property, to be replaced with additional parking. <br /> • Eliminate the second driveway entering/exiting the subject property. <br /> The applicant states that the overall appearance of the project will result in a significantly <br /> reduced version compared to the original proposal. Landscaping and the coral shrine <br /> grotto that was completed in the first phase will remain. To expedite the start of <br /> construction, the applicant has begun acquiring the required building permits for the <br /> project. Currently the parish has received the approved foundation permit and is waiting <br /> for final approval of the vertical building permit. According to the applicant, they are <br /> currently working on finalizing contract negotiations with a local General Contractor for <br /> the project. <br /> 3. Landowner: The landowner of the property is the Roman Catholic Church. <br /> BACKGROUND INFORMATION <br /> 1. October 14, 2010: Effective date of approval of SMA No. 10-000044 to allow the <br /> construction of a church, rectory, and parish hall and related improvements. (Planning <br /> Department Exhibit 2—SMA No. 10-000044,Approved on September 30, 2010) <br /> 2. July 21,2015: The Planning Director grants an administrative 5-year time extension or <br /> until October 14, 2020 to comply with Condition No. 3 (time to complete construction). <br /> -2- <br />