My WebLink
|
Help
|
About
|
Sign Out
Home
BACKGROUND REPORT
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2020
>
2020-11-19 Leeward
>
Item #1 Palamanui Global (AMEND REZ 05-000010)
>
BACKGROUND REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2020 9:56:51 AM
Creation date
11/13/2020 9:49:26 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Phase II <br /> Phase II would expand development centered around the University Village Town <br /> Center and construction would commence within two years of receipt of all <br /> necessary development permits and be completed within five years of the <br /> commencement date. <br /> • Up to 200 residential units, <br /> • 10 acres of unimproved public park conveyed to the County, <br /> • Extension of Road 2 (University Drive) from about 1,000 feet mauka and <br /> 1,500 feet makai of Road 3A(Ane Keohokalole Highway). <br /> Phase III <br /> Phase III would mainly be constructed between Queen Ka`ahumanu Highway and <br /> Road 3A/Main Street(Ane Keohokalole Highway). Upon completion of Phase <br /> III, the public will be able to drive from Queen Ka`ahumanu Highway to the <br /> UHWH campus through the Palamanui property. Construction would commence <br /> upon completion of Phase II, or possibly earlier depending on market conditions, <br /> and be completed within five years of the commencement date. <br /> • Business Park, <br /> • Up to 50 residential units (for a total of 500 residential units at the end of <br /> Phase III), <br /> • Up to 30,000 square feet of commercial space in the University Village <br /> Town Center, <br /> • Up to 60 hotel rooms (for a total of 120 hotel rooms at the end of Phase <br /> 111), <br /> • A second wastewater treatment plant, <br /> • Signalized intersection at Queen Kaahumanu Highway and Road 2 <br /> (University Drive), <br /> • Signalized intersection at Ka`iminani Drive and Road 3A(Ane <br /> Keohokalole Highway). <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.