Laserfiche WebLink
roadways that have occurred since 2009 when Ordinance No. 09 132 was adopted. First, <br /> in the ordinance, Road 6A is referred to as Ane Keohokalole Highway but the alignment <br /> for this highway has shifted west to align with Road 3A. Therefore, all references to Ane <br /> Keohokalole Highway in the requested amendments refer to Road 3A. Because of this <br /> shift, the Department of Public Works has requested, and Palamanui has agreed, to shift <br /> the future Road 1 alignment to connect to the northern terminus of Road 3A (Ane <br /> Keohokalole Highway)rather than Road 6A. <br /> The Palamanui Development will continue to consist of a mixed-use development <br /> with 1,116 residential units (inclusive of required affordable housing); a 70-acre business <br /> park; 230 acres of open space; a 74-acre Dry Forest Preserve; a 30-acre"University <br /> Village Town Center"with a 120-room hotel and retail shopping and commercial <br /> amenities to support the UHWH and surrounding businesses; and a 20-acre regional <br /> public park. <br /> The phasing plan was created based on a Traffic Assessment("TA") dated August <br /> 10, 2017,prepared by Austin, Tsutsumi and Associates, Inc. and which is also consistent <br /> with prior Traffic Impact Assessment Reports prepared for the Palamanui project by <br /> SSFM in 2014 and 2016. The applicant has modified development components of Phase <br /> II and III compared to the TA. A main difference is the Business Park is developed in <br /> Phase II of the TA with a signalized intersection at the Queen Ka`ahumanu Highway- <br /> University Drive(Road 2)intersection, rather than in Phase III as currently proposed. In <br /> the TA,University Drive would not be connected between the Business Park and <br /> University Village until Phase III. The TA concluded that a traffic signal would not be <br /> required at the Ka`iminani Drive-Ane Keohokalole Highway intersection until after the <br /> completion of a combined 500 residential units; 30,000 square feet of commercial space; <br /> and 60 hotel rooms. Traffic Impact Analysis Reports (TIAR's)prepared by SSFM in <br /> 2014 and 2016 concluded that Road 1 (New Connector Road),between the Palamanui <br /> property and Mamalahoa Highway, is not necessary to mitigate traffic impacts generated <br /> by Palamanui. Based on this conclusion, the applicant believes placing the responsibility <br /> of constructing Road 1 solely on Palamanui is not proportional to their project impacts. <br /> i -11- <br />