Laserfiche WebLink
• Designing and constructing an $11.55 million water system to support not only <br /> the Palamanui project but future growth of the UHWH campus; and <br /> • Installing power and cable to the UHWH campus at a cost of$400,000. <br /> The UHWH opened its doors in Fall of 2015. Palamanui hopes to develop its <br /> planned University Village which will provide support to the UHWH, as well as to <br /> continue assisting with the direct development of the UHWH campus. However, its <br /> financial ability to do either has been constrained by some conditions of the Project <br /> District ordinance. <br /> Thus, the applicant is requesting amendments, deletions and additions to the <br /> following conditions of Ordinance No. 09 132: <br /> • Amend Condition S (Scope and Timing of Park Improvements) <br /> • Condition V (Scope and Timing of Road Improvements): <br /> ■ Amend V 1 a-University Drive <br /> ■ Amend VIc3- Queen Ka`ahumanu Highway-University Drive <br /> Intersection <br /> ■ Amend V2- Signalization of Ka`iminani Drive-Ane Keohokalole <br /> Highway(formerly Kamanu Street) Intersection <br /> ■ Amend V3- Road 3A Extension(Main Street) <br /> ■ Amend V4-Road 1 (formerly connected to Road 6A) <br /> ■ Delete V6-Makalei Drive <br /> ■ Add V7-Road 6A(formerly Ane Keohokalole Highway). <br /> The specific requests follow(material to be deleted is bracketed/struck through, <br /> material to be added is underscored): <br /> Amended Condition S: <br /> S. The applicant shall [develop one 20 a o ark site p to the; e of <br /> the buildi..,...o.mit for-the 10 1'single f.. ily„ „1f; family r-esi elwe <br /> within the et] provide a minimum of twenty(20) acres of land for a <br /> public park and neighborhood open space in accordance with the Kona <br /> Community Development Plan, ten(10) acres of which shall be developed <br /> -2- <br />