My WebLink
|
Help
|
About
|
Sign Out
Home
PD RECOMMENDATION
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2020
>
2020-11-19 Leeward
>
Item #1 Palamanui Global (AMEND REZ 05-000010)
>
PD RECOMMENDATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2020 10:53:41 AM
Creation date
11/13/2020 10:52:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
subdivisions north of University Drive are proposed to be built during Phase II. <br /> This would provide better connectivity between the local roads within the <br /> subdivisions and adjacent collector roads. <br /> The unimproved right-of-way can be landscaped with grass and used as a <br /> passive recreational or civic space where farmer's markets and other similar <br /> temporary uses can occur. No permanent structures, except for utilities,would be <br /> allowed in the unimproved right-of-way. The unimproved right-of-way would be <br /> dedicated to the County at no cost upon request. <br /> Condition V4 (new Condition T4): This condition relates to the New <br /> Connector Road(Road 1).The applicant's traffic studies indicate Road 1 is not <br /> needed to mitigate the impacts of the Palamanui project. However, the applicant <br /> committed to constructing a mauka-makai regional connector road from Queen <br /> Ka`ahumanu Highway to Mamalahoa Highway at their sole cost and expense, and <br /> this requirement is stated in Condition 5b of the Land Use Commission's <br /> Decision& Order(Docket#A03-744) that reclassified the property to the Urban <br /> District in 2005. The connection of Road 1 to Mamalahoa Highway is essential <br /> because the next mauka-makai road is Ka`iminani Drive which is about 2 miles <br /> south. The applicant is still committed to providing Road 1 but is requesting to <br /> defer the submittal of any subdivision or building permit applications for any <br /> residential development beyond 900 residential units unless and until the <br /> construction cost of Road 1 is bonded or completed either by the applicant or <br /> some other entity, or if an alternative public road connection between the project <br /> area to Mamalahoa Highway becomes available. <br /> The Planning Director agrees with the applicant's amendments with <br /> modifications. The Director recommends retaining the current condition language <br /> regarding road width and grade, which the applicant is proposing to delete. <br /> Additionally,the Planning Director concurs with DPW recommendations of <br /> keeping a consistent right-of-way width of 120 feet the entire length of the <br /> roadway,rather than the 88-feet right-of-way over private lands within the <br /> -23- <br />
The URL can be used to link to this page
Your browser does not support the video tag.