My WebLink
|
Help
|
About
|
Sign Out
Home
PD RECOMMENDATION
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2020
>
2020-11-19 Leeward
>
Item #1 Palamanui Global (AMEND REZ 05-000010)
>
PD RECOMMENDATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2020 10:53:41 AM
Creation date
11/13/2020 10:52:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
at the developer's cost. <br /> Condition V3 (new Condition T3): This condition relates to the Ane <br /> Keohokalole Highway Extension(Road 3A Extension)within the Palamanui <br /> property. With the recent completion of the Ane Keohokalole Highway segment <br /> by the applicant between Ka`iminani Drive and the University, the DPW <br /> determined that it would be most appropriate to extend the highway through the <br /> Palamanui property as an arterial roadway, rather than have Road 6A (located to <br /> the east) serve as the north-south arterial roadway through the property. The <br /> applicant is agreeable to this and has modified their Regulating Plan to reflect this <br /> change. The applicant's requested amendment is to remove language stating the <br /> roadway is to be designed to function as a portion of future Road 1 connecting to <br /> Mamalahoa Highway, and to clarify it will be dedicated to the County upon <br /> request, rather than when needed to connect to Road 1. <br /> The Planning Director agrees with the applicant's amendments with <br /> modifications. Kona CDP Policy TRAN-1.2 indicates the Ane Keohokalole <br /> Highway is to be the transit trunk line between Kailua-Kona and the airport, thus <br /> a large right-of-way is needed to accommodate a transit line and bus and transit <br /> stops. The 120-foot wide right-of-way will be sufficient to meet this policy. DPW <br /> recommends the road be constructed with sidewalk,drainage improvements and <br /> street lighting. DPW also recommends the applicant construct a 60-foot wide <br /> section of the right-of-way to connect with the existing Ane Keohokalole <br /> Highway alignment to the south, and rough grade the remaining 60 feet of right- <br /> of-way. DPW recommends the improved portion be constructed and dedicated to <br /> the County from the UHWH campus to University Drive in Phase I and from <br /> University Drive to the northern property boundary in Phase III, rather than in <br /> Phase IV as shown on the applicant's Regulating Plan. The Planning Director <br /> agrees with DPW that the Ane Keohokalole Highway extension should be <br /> constructed from University Drive to the northern property boundary in an earlier <br /> phase but recommends construction in Phase II since the adjacent residential <br /> -22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.